20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 19, 2018
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 18, 2018
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2004 projects
2004 projects
Project name
Type of completed works
Details
Electrical supply to building No. 8 at B. Kitayevskaya St., Kyiv
Installation works in TSS 2X1000 KW, 10 kV CL from DP164, TSS2256, DP287, TSS1327 to the TSS. Re-laying of the 0.4 kV CL and 10 kV CL. Laying of the 10 kV CL SS Moskovskaya – DP 287. Outdoor lighting.
Electrical supply to the building at 9, Narodnogo Opolcheniya St., Kyiv
Laying of the 0.4 kV CL of DP-307-MDB of the building’s section and 0.4 kV CL from DP-307 to CA-5 at building No. 9. Outdoor lighting. DP-307 reconstruction.
Reconstruction of the residential building with a hotel complex at 20, B. Zhytomirskaya St., Kyiv
Cable communications inside the building. Anti-corrosion cable protection. Electrical supply to the control room. Installation works in the built-in TSS-4x1000 KW. Laying of the 10 kV CL from DP 410 to the built-in TSS of the building.
Construction of the retail and office centre with a parking lot at 1, Sports Sq., Kyiv
Transfer of the 10 kV CL of the Tsentr SS-DP225 and the Tsentr SS-DP407. Relaying of the 10 kV CL “Tsentr SS – DP41”. Re-laying of 10 kV CL being in the building area: Tsentr SS-DP1373 No. 1, No. 2. TSS-1373-TSS1369 No. 1, No. 2, DP373-DP563. DP399-DP3425 No. 1, No. 2. Lighting of the header chambers. Installation of cable structures in the pipe header cable wells.
Reconstruction of the Dnieper Hydroelectric Pumped Storage Power Plant, Kyiv HPP
G-7 hydro-electric set reconstruction.
Electrical supply to residential buildings at 5A, Mateyuk St., Kyiv
Laying of the 10 kV CL TSS2799-TSS2825, laying of the 0.4 kV CL TSS2799-WDM-1-1(2-1) of the building and the WDM-PH (TSS). Outdoor lighting. TSS-2799 reconstruction.
Reconstruction of the Kharkovskaya 110/10 kV SS
Construction and installation works and installation of the manufacturing equipment. Installation of the 110 kV transformer with a capacity of 16 MBA. Reconstruction of the existing fire extinguishing system and organization of the automatic transformer fire extinguishing. Reconstruction of the existing firefighting pumping house. Installation of an additional tank for storage of the estimated amount of fire water. Reconstruction of the 110 kV ISG (erection of a cell for connection of the AT and a cell connected through the circuit breaker for further transition to the typical quadrangle circuit). Extension and reconstruction of the 110 kV ISG and organization of a new cell with a circuit breaker for connection of AT1, and also replacement of transformers in the existing cells with the 110 kV IDD. Replacement of auxiliary transformers and auxiliary standby power supply to consumers for connection of new facilities. Relay protection. Telemechanics and automatics. Replacement of auxiliary transformers and auxiliary standby power supply to consumers for connection of new facilities. Equipment for protection of the service personnel from the electromagnetic field (bio-protective screens).
Electrical supply to the residential buildings at 13-A-G, Saksagansky St., Kyiv
Laying of the 10 kV CL, the 0.4 kV CL. TSS construction. Outdoor lighting.
Repair of Skoda car show room at 13, Krasnoarmeyskaya St., Kyiv
Indoor premise and façade finishing works. Indoor electrical installation works.
Electrical supply to the residential buildings at Lunacharsky St. and Bolnichnaya St. in Dnieprovsky district, Kyiv
Bringing of the 10 kV CL and the 04. kV CL beyond the building area. Construction works related to reconstruction of the 10/,4 kV TSS in terms of replacement of the 10 kV SG with the 0.4 kV SG. Installation of the cable and piped sewerage.
External electrical supply to the residential building at 4, Yakubovski St., Kyiv
Laying of the 0.4 kV CL from the TSS to UVR-1 and UVR-3. Laying of the 10 kV CL from TSS1571, TSS4307, TSS4308, and TSS4539. Outdoor electrical lighting. Electrical installation works in the 10/0.4 kV TSS.
Electrical supply to construction of the Deriuguiny Rhythmic Gymnastics School at 13A, Druzhby Narodov St., Kyiv
Bringing of the 10 kV CL and the 0.4 kV CL beyond the building area. PTSSUEN installation. Laying of the 10 kV CL.
Reconstruction of utility networks at 22, 24a, b, 26 Yaroslavov Val St., Kyiv
Switching of the existing load from PTS 5903 to the 10 kV DP. Electrical supply to TSS4106 and 4181. Laying of 2 10 kV cables from Tsentr SS to the 10 kV DP. Reconstruction of outdoor lighting at Streletskaya St. Cable chamber construction.
Electrical supply to residential buildings at Lunacharski St. – Milchakov St., R. Okipnaya St., Kyiv
Laying of the 10 kV CL Khimicheskaya SS – DP-10 CL at Lunacharsky St. (from the connection point with the header to TSS No. 1 at Okypnaya St.). Laying of the 10 kV CL Khimicheskaya SS – DP-10 CL at Lunacharsky St. (before the connection point outside the header.
Laying of the 110 kV CL: Kharkovskaya SS – Osokorki SS
Laying of the 110 kV CL Kharkovskaya SS – Osokorki SS with the FOCL line.
Construction of the additional residential building with an underground parking lot to the existing building of a hall of residence with reconstruction of the hall of residence into a residential building at 6, Laboratorny Lane, Kyiv
Construction and electrical installation works, 2x1000/10/0.4 kV TSS.
Electrical supply to the residential building at 8/26, Shevchenko St., Kyiv
Installation of the underground 10/0.4 kV TSS, re-laying of the 10 kV CL and the 0.4 kV CL.
Electrical supply to the Metro shopping mall at the corner of Grigorenko St. and Krushelnytska St. in Kyiv
Laying of the 10 kV CL of DP-419-TSS (new).
Temporary electrical supply to the Metro Cash & Carry shopping mall at Moskovski Av. in Obolon district, Kyiv
10 kV CL laying. 
Laying of the 110 kV CL: Oktiabrskaya SS – Stankozavodskaya SS in Kyiv
110 kV CL laying: Oktiabrskaya SS – Stankozavodskaya SS. Reconstruction of the 110 kV ETL. Rebuilding of the 0.4 kV HVL.
Replacement of a section of the 110 kV Oktiabrskaya – Mototsykletnaya overhead line with the 110 kV Oktiabrskaya – Mototsykletnaya CL in Kyiv
Replacement of a section of the 110 kV overhead line. Reconstruction of 220 kV supports and installation of transition devices. Laying of the 110 kV cable line (2.5 km). Installation of portals and end sleeves for transition from the 110 kV HVL to the 110 kV CL and vice versa.
Shopping mall with a NISSAN service station
Cable lines

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07300
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.