18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
15.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
13.06.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of June 11, 2018
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2006 projects
2006 projects
Project name
Type of completed works
Details
Works to complete the bank construction at 17, Artema, Shevchenko district, Kyiv
Laying of the 10 kV CL. Installation works in the built-in TSS-2x1000.
Electrical supply to the office centre at 1a, Naberezhno-Kreshchatitskaya St., Kyiv
Laying of the 10 kV CL and the 0.4 kV CL. Installation and dismantling of the 10/0.4 kV PTS.
Restoration of the monument of architecture of the first half of the 20th century: the Archangel Michael Church located in Krinichnoye village, Bolgrad district, Odessa region
Completion of the full range of construction and restoration works on a turnkey basis.
Reconstruction of the tomato workshop into the wine workshop with the capacity of 50 t of wine processing per season for Veles Llc in Krinichnoye village, Bolgrad district, Odessa region
Completion of the project reconstruction works on a turnkey basis.
Construction and repair works of the Troyeshchyna manufacturing facilities of Kyivenergo JSC in Kyiv
Completion of a range of construction, electrical and installation works.
Electrical supply to the mobile communication centre at 49/2 Pobedy Av., Kyiv
Laying of the 10 kV CL. Electrical installation works at the 10 kV DP.
Construction of residential buildings at 12-14 Sofiyevskaya St., Kyiv
Laying of the 10 kV CL and the 0.4 kV CL. Installation of the 10/0.4 kV temporary PTS and transfer of the 10 kV CL and the 0.4 kV CL to the PTS. Dismantling of TSS-44. Installation works at the TSS-2x1000 KWA. Outdoor lightning.
Reconstruction and technical re-equipment of ST-1. External electrical supply. Technical re-equipment of the 110/10 kV Bastionnaya SS, 110/35/10 kV Solomenskaya SS, 110/10 kV Polytechnicheskaya SS.
Replacement of the existing auxiliary transformers and auxiliary standby power supply to consumers for connection of new facilities. Installation of 110 KV sulphur hexafluoride switches, disconnect switches, and other devices and equipment. Cable laying. Installation of metal structures for equipment. General construction works.
External electrical supply to the residential building at 1v, Postyshev St., Brovary, Kyiv region
Switching of the existing 10 kV and 0.4 kV electrical networks. Laying of the 10 kV CL and 0.4 KV CL.
Reconstruction of the 110 kV Oktiabrskaya-Politekhnicheskaya cable line
Reconstruction of 110 kV Oktiabrskaya-Politekhnicheskaya cable line No.1, 2 in the section from Cst-3 to Kst-8.
Laying of the 110 kV CL: Politekhnicheskaya SS – Vokzalnaya SS
Laying of the 110 kV CL: Politekhnicheskaya SS – Vokzalnaya SS.
Laying of the 110 kV CL: Centre SS – Vokzalnaya SS
Laying of the 110 kV CL: Centre SS – Vokzalnaya SS. Relaying of the 10 kV CL on the territory of ST-1. Relaying of the 10 kV CL: DP-508 – Vokzalnaya SS on the territory of ST-1.
Reconstruction of OT No. 3 of ST-1 in the section from HC-302 to HC-315 at Saksaganski St., Lev Tolstoy St., Zhylanskaya St. in Goloseyevski district and Shevchenko district, Kyiv
Reconstruction of OT No. 3 of ST-1 in the section from HC-302 to HC-315 at Saksaganski St., Lev Tolstoy St., Zhylanskaya St. in Goloseyevski district and Shevchenko district, Kyiv. Construction of BC-306 hall.
Construction of the exhibition hall (show room) for Audi car sale at Dneprovskaya Naberezhnaya, Kyiv
Construction of the exhibition hall (show room) for Audi car sale.
Electrical supply to the Chervona Ruta recreation facility in Rudyky village, Obukhov district, Kyiv region
Laying of the 10 kV CL from the 35/10 Sosnovy Bor SS to the 10/0.4 Chervona Ruta TSS, installation of cells at the 35/10 Sosnovy Bor SS.
Electrical supply to residential buildings with social and cultural facilities at Tychyna Av./Dneprovskaya Naberezhnaya in Kyiv
Laying of the 10 kV CL from the Rusanovskaya SS to the feeder point.
Reconstruction of the Dnieper Hydroelectric Pumped Storage Power Plant, Kyiv HPP
Construction and electrical installation works related to two 6/0.4 kV PTS. Laying of the 6 kV CL 11.1 km long on the structures. Replacement of dischargers with 110 kV OSG. Outdoor lighting of the ELF (Engineering Laboratory Facilities) building under reconstruction.
Electrical supply to the industrial facility at 50, Mashynostroitelnaya St.
0.4 kV CL switching. Temporary scheme. Installation and dismantling of the 10/0.4 kV PTS. Laying of the 10 kV CL. Switching under the permanent scheme. TSS-2888 reconstruction.
Electrical supply to the hotel and office complex at 3-17, Sagaydachny St., Kyiv
10/0.4 kV PTS installation. Laying of the 10 kV CL for electrical supply to the building machinery. Removal of the 0.4 kV CL beyond the building area. Removal of the support wall outdoor lighting. Anti-corrosion cable protection. Outdoor lighting installation.
Hotel complex with an underground parking lot at the intersection of Borichev Spusk St. and Sagaydachny St. in Kyiv
Laying of 6 0.4 kV CL from TSS 4823 to the DB.
Reconstruction of the building with a built-up attic floor to be used as an office of Kyivenergo Company at 31, Melnykova St.
Indoor finishing, sanitaryware, and electrical installation works. Repair of the building’s roof.
Construction of the administrative and hotel complex at 2-A, B. Zhytomirskaya St., Kyiv
Laying of two 10 kV CL: Centre SS – DP4. Electrical installation works at 10/0.4 kV TSS. Works in the header: cable structures, lighting, grounding, power cable lines. Laying of the 0.4 kV CL, power supply to the 1.2-0.4 kV MDB, anti-corrosion cable protection.
Reconstruction and technical re-equipment of ST-1 in Kyiv
Installation of monolithic reinforced concrete rafts for the gas pipeline supports from boiler No. 2 to the new chimney. Installation of the ABC building foundations and the fire safety pumping facility. Installation of foundations for 2 2,000 m3 fire water tanks. Trestle installation and reconstruction of the support (for transferring sections of district heating network No. 1) of external process pipelines. Trestle installation for external process pipelines (section between the ABC building and the WTP). Removal of circulation water pipelines beyond the building area.
Reconstruction and technical re-equipment of ST-1 in Kyiv. The 110/6 and 35/6 kV SS of ST-1 and the 110/10 KV Vokzalnaya SS.
Construction of the 110/6 and 35/6 KV SS, installation of equipment, reconstruction of the 110/10 KV Vokzalnaya SS.

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07300
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.