·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
15.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
13.06.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of June 11, 2018
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2008 projects
2008 projects
Project name
Type of completed works
Details
Construction of the Pushkinskiy residential complex located at 25A, Degtiarevskaya St., Shevchenko district, Kyiv. Firs start-up facilities.
Removal of the CL-35, 10 and 0.4 kV, beyond the building area. Cable protection against corrosion. 10/0.4 kV PTSS No. 2 (package transformer substation). Construction and installation works. 10 kV CL for electrical supply to 10/0.4 kV PTSS No. 2. 10/0.4 kV DP. Electrical ad installation works. Reconstruction of cells No. 14 and No. 28 at the Dovzhenkovskaya SS. Laying of two 10 kV CL for power supply to the 10/0.4 kV DP.
Development of residential district 6 of the Osokorki-Severnye residential area in Darnytsia district, Kyiv
Construction and installation works related to re-equipment of the 35 kV overhead line into the 35 kV cable line from support No. 35 to support No. 33 and installation of a new support to replace support No. 30.
External electrical supply to the residential complex located at 21, Zhovtneva St., Vyshneve, Kyiv-Sviatoshyn district, Kyiv region
Electrical and installation works at the 10/0.4 kV TSS and installation of an outdoor lighting box and SO-90 recording cabinet.
Laying of the 0.4 kV CL from the designed TSS to the MDB in the construction sections.
Laying of the 10 kV CL from TSS-1384 – TSSpr.
Electrical supply to the complex of residential buildings with social premises and a parking lot located at 59, Zverinetskaya St., Kyiv
Outdoor lighting removal.
Installation of outdoor site lighting.
Installation of outdoor street lighting.
Repair of uncompleted  110/35/10 kV SS of Volyn-cement OJSC in Zdolbunov, Rivne region
Performance of a range of works related to removal of building constructions, a cable, and electrical equipment. General construction, finishing, façade, and interior works. Development of underground facilities at the 110 kV DP (chamber, cable entry channels, foundations). Reconstruction of the cable channel at the 6 kV DP.
High-rise apartment building with built-in non-residential premises and an underground parking lot located at 10-12, Perov Avenue, Kyiv
Laying of the 10 kV CL at the PTS from TSS-138 and TSS-142 and the CL from TSS-5782 to the PTS. PTS installation. Anti-corrosion cable protection. Reconstruction of 10 kV cell No. 1 at TSS-138. Removal of the 10 kV CL beyond the construction area of the CL of DP-143-TSS-144.
External electrical supply of apartment buildings with social infrastructure facilities located at 4, 8-16 R. Okipnaya St., Kyiv
Electrical installation works at the 10/0.4 kV TSS (No. 1 and No. 2). Installation of internal networks and systems of electrical supply to the parking lot. Laying of the 10 kV CL to the 10/0.4 kV TSS (No. 1 and No. 2). Laying of the 0.4 kV CL from the 10/0.4 kV TSS (No. 1 and No. 2). Installation of 0.4 kV electrical equipment in block No. 1. Installation of the earthing ring in switch rooms. Anti-corrosion cable protection. Installation of transformer artificial ventilation and transformer bus re-arrangement. Installation of outdoor lighting of the territory of block No. 1 and block No. 2. Reconstruction of TSS-6330.
External electrical supply of the residential building complex with social and cultural facilities at the intersection of Tychyna Avenue and the Dnieper embankment in Darnytsia district, Kyiv
Installation of the pipe header. Installation of outdoor lighting. Laying of the 0.4 kV cable in switch rooms in buildings No. 1 and No. 2. Thermal protection of transformers.
Reconstruction of a canteen and a cafeteria in Vyshgorod at 7, Naberezhnaya St.
Completion of a range of general construction, sanitaryware, electrical installation, and finishing works on a turnkey basis.
Reconstruction of Dnieper Hydroelectric Pumped Storage Power Plant, Kyiv HPP
Reconstruction of G-11, G-17 hydro-electric sets.
Apartment buildings with social and welfare facilities and an underground parking lot located at 73-79 v Lomonosov St., Golosiivsky district, Kyiv
Removal of the cable line beyond the building area.
Reconstruction of the inlet and outlet station mixing headers of heat mains No. 1-6 of CHPP-5 of Kyivenergo JSC.
Foundation setting. Laying of pipelines connecting block No. 2 and block No. 3 along axle “A” of the main building. Installation of shut-off control valves. Installation of an automatic system for the shut-off and control valves made by ADAMS.
Electrical supply of the Kyiv-Airport logistics centre in Boryspil district, Kyiv region
Construction works related to construction of the new 10 kV DP. Electrical installation works at the 10 kV DP. Supply of equipment for the 10 kV DP. Commissioning and start-up of the 10 kV DP. Electrical installation, commissioning, and start-up related to installation of 2 cells going to the Strela SS. Replacement of 2 6.3 MVA power transformers with 10 MVA ones at the Strela SS. Reconstruction of the relay protection at the Strela SS. Laying of the 10 kV CL from the Strela SS to the new 10 kV DP. Laying of the 10 kV CL from the 10 kV DP to the 10/0.4 kV TSS and 10/0.4 kV PTS of warehouses No. 1 and No. 2. Laying of the 10 kV CL from the 10 kV DP to 10/0.4 kV TSS No. 1 and No. 2 of the production building. Removal of the 10 kV CL beyond the building area.
Electrical supply to the residential building with built-in and attached public service premises at the intersection of Dnieper Heroes St. and Stalingrad Heroes Av. in Kyiv
Electrical installation works at the 10/0.4 kV TSS. Laying of the 10 kV CL from DP-422 (cells No. 8 and No. 7) to the TSS-5759 and TSS-6595. Anti-corrosion cable protection. Replacement of transformer TZLE-125 No. 8 at DP-422.
Electrical supply to the administrative building at 3-7, Kiyanovski Lane, Kyiv
Installation of the 10/0.4 kV underground PTS. Laying of the 10 kV CL for power supply to the 10/0.4 kV underground PTS in section of the existing DP-152-DP-6474 line. Laying of the 0.4 kV CL from the underground PTS to buildings No. 3-7 and the office centre. Ant-corrosion cable electrical protection. Energy accounting at the 10/0.4 kV PTS.
Reconstruction of uncompleted Teatralnaya Hotel located at 17/52, Bogdan Khmelnitsky St., Kyiv
Laying of the 10 kV CL for the Vokzalnaya SS – DP 62. Reconstruction of cell No. 43 at the Vokzalnaya SS. Reconstruction of cells No. 13, No. 20, and No. 5 at DP-62. Electrical installation works at the 10/0.4 kV TSS. Laying of the 10 kV CL for electrical supply to the 10/0.4 kV TSS (1st section from TSS-4876 and TSS-6331, 2nd section from DP-62 and TSS 6331).
Installation of pipe transition pieces at Kominterna, Zhylanskaya, and I. Franko Streets. Laying of the 0.4 kV CL for electrical supply to building mechanisms.
Reconstruction of the non-residential three-storey building with two built-up floors located at 4a, Ivan Lepse Av., Kyiv
Works related to internal electrical supply. Installation of IDD-78M8 (Input Distribution Device) and MDBs, indoor lighting installation.
Construction, installation, and start-up works related to reconstruction of Vokzalnaya SS in Kyiv
Laying of ISG (Indoor Switchgear) cables at the 110/6, 35/6 kV SS. Installation of metal structures in the ISG at the 110/6, 35/6 kV SS. Removal of 10 and 0.4 kV cable jumpers at the 110/10 kV Vokzalnaya SS. Laying of cables at the 110/10 kV Vokzalnaya SS. Removal and installation works in the 110 kV ISG of the 110/10 kV Vokzalnaya SS. Removal works in the 10 kV ISG of the 110/10 kV Vokzalnaya SS. Removal of the rectifying device at the 110/10 kV Vokzalnaya SS. Removal of the cable of the 110 kV CL. Actuation of the cable at the ST-1 SS. Installation of joints in the 110 kV CL of the Sports Palace. Re-laying of the cable of the 35 kV CL on the territory of the 110/10 kV Vokzalnaya SS. Installation of the indoor earthing ring at the Vokzalnaya SS. Installation of indoor lighting at the Vokzalnaya SS. Installation of indoor lighting at the ST-1 SS. Installation works in the battery room at the 110/10 kV Vokzalnaya SS. Electrical installation works related to replacement of transformer inlets at the 110/10 kV Vokzalnaya SS. Laying of the 0.4 kV temporary CL for actuating 110/6 kV transformers at the ST-1 SS. Reconstruction of 10 kV cells at the Vokzalnaya SS.
Performance of indoor sanitaryware works in the logistics complex of MPP Spektr (warehouse No. 2) located at Promyshlennaya St., Obukhov, Kyiv region
Performance of a range of indoor sanitaryware works in the logistics centre of MPP Spektr (warehouse No. 2) located at Promyshlennaya St., Obukhov, Kyiv region.
External electrical supply to the residential complex with social and public premises, parking lots, and development of the Kristerovaya Gorka natural monument located at 45, Vyshgorodskaya St. in Podol district, Kyiv
Laying of the 10 kV CL from Kurenevskaya SS – DP. Electrical installation works at the 10 kV DP (relay protection, alarm and telemechanics control). Re-actuation of the 10 kV CL from DP-146 and TSS-5288 at the Kurenevskaya SS. Laying of the parallel cable of the 10 kV CL from the Kurenevskaya SS – 10 kV DP. Installation of PTSSUEN-1000-10/0.4 kV No. 1, No. 2. Removal of electrical networks beyond the building area and power supply to building mechanisms. Anti-corrosion cable protection.
Construction of Dniestr Hydroelectric Pumped Storage Power Plant projects in Novodniestrovsk, Chernivtsi region
Performance of a range of works related to construction of Dniestr Hydroelectric Pumped Storage Power Plant (Water discharge: powering the cable of the SWS (Service Water Supply) pumping house; cable tray metal structures; power cable for own needs; installation of the utility bridge, electrical supply to drainage pumps. Installation and removal of PTS. Installation of electrical equipment for own needs. Installation of the 330 kV HVL flexible couplings. Installation of the utility bridge and laying of the 6 kV CL to the emergency power supply substation, etc).
Transition of the 330 kV Simferopol-Sevastopol overhead line with reconstruction and extension of the Simferopol SS and Sevastopol SS.
Performance of works related to construction of buildings and facilities (check passage, diesel room, valve chamber, etc). 330 kV Sevastopol SS.
2016 SS110

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07300
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.