Ј
27.07.2018 Notification of the emergence of special information of the issuer
Ј
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 19, 2018
Ј
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 18, 2018
Ј
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
Ј
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
  Last news

Ј
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
Ј
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
Ј
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" Ц always be on step ahead of!

Name
E-mail

GISMETEO: ѕогода по г. иев
Finalized projects · 2010 projects
2010 projects
Project name
Type of executed works
Description
330 kV cable line laying for external power supply of electrosmelting complex on section from Pridneprovskaya CHPP to SS 330/35/10 kV УPechnayaФ Construction works, cable lines. 330 kV cable lines laying, construction of pits. Arrangement of piped overpasses and installation of pipes into carrying cases. Installation of communication cables and telemechanics system. Installation of terminal boxes (12 pcs.) and joint sleeves (84 pcs.). Laboratory testing of cable and sleeves. Restoration of roads covering, pavements and green zone.
Reconstruction of 110 kV cable line УCHPP-5 Ц SS УBastionnayaФ є1, 2 (2-nd stage) Construction works, cable lines. Execution of works under reconstruction of facility on turnkey base
External power supply of plant which produces MDF in Korosten city, Zhitomir district, Oktyabrskaya str., 11-b. Construction works, cable lines. Execution of complex of construction, electrical installation and commissioning works under construction of SS 35/10 kV УProgressФ and 35 kV cable line laying SS УIskorostФ Ц SS УProgressФ on turnkey base
Construction of residential house є4 according to overall plan with built-in public facilities in district УMasyukovschina-5Ф in Minsk city, the Republic of Belarus Construction works Execution of complex of works under construction and commissioning of residential part of the house
Reconstruction of electrical networks in the private housing of Pechersk district on streets Staronavodnitskaya, Panfilovtsev, Redutnaya, Kozyatinskaya and Reuta alley in Kyiv city Electrical installation works, cable lines, installation of equipment.  10 kV cable line laying for power supply of Packaged Transformer Substation-3. Connection of 4 0,4 kV cable lines to Packaged Transformer Substation-6508. Installation of two panels SK-7 and their connection
External power supply for living quarter with social and public facilities on Professor Podvyisotskiy street in Kyiv. Electrical installation works, cable lines, installation of equipment. Dismantling of Packaged Transformer Substation 6841 and Packaged Transformer Substation 6842. Switching of 10 kV cable lines.
Conversion to 330 kV voltage overhead line Simferopol-Sevastopol with the reconstruction and extension of the SS "Simferopol" and SS "Sevastopol". Electrical installation works, construction works. Electrical installation works on OSG 35 kV, OSG 110 kV, OSG 220 kV, OSG 330 kV of SS "Sevastopol". Off-site network pressure of sewer and water mains. Internal water supply and sewerage network. Plumbing works on firefighting pump station. Onsite network of sewer pump station, oil drain, pressure sewer, drinking water, fire water. Installation of the floodlight towers and radio masts - antennas. Construction and installation work on the installation of the main transformers. Installation of the inner and outer fences, etc
Construction of trade and office complex with community facilities and parking on Sportivnaya sq. 1 in Pechersk district, Kyiv Electrical installation works, cable lines. Re-laying of 10 kV cable line –ѕ373-“ѕ3692. Re-laying of kV cable line SS УBastionnayaФ - “ѕ5880, SS УBastionnayaФ - –ѕ11.
Installation of the column crane

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07301
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.