27.07.2018 Notification of the emergence of special information of the issuer
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 19, 2018
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 18, 2018
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2012 projects
2012 projects
Name of project Type of executed work Specifications
SS 330/110/10 kV “Severnaya”  Construction and electrical installation works Within the scope of reconstruction on OSG 330 kV replacement of following equipment that was overage was performed:
  • air circuit breakers by SF6 ones – 7 pieces
  • single pole disconnectors – 60 pieces
  • current transformers - 7 pieces
  • voltage transformers – 3 pieces
  • surge arrestors – 1 pieces
 On OSG 330 kV there were performed replacement of 22 damaged ferroconcrete bus-type and lines portals by metallic ones, except bay “AT-1” and bay “AT-2” witch have 5 portals to be replaced together with bus arrangement by open wire AC 400/51.
Within the scope of reconstruction on OSG-110 kV at the present time has completed replacement of following equipment:

  • replaced of 5 exciting oil circuit breakers by SF 6 ones for creation of scheme 110-8 ( two in operation, suctioned by circuit breakers bus bar systems and bypass system of bus bar with two bus bar connecting circuit breakers.). 20 pieces remain for replacement.
  • three pole disconnectors 110 kV that were overage by disconnectors with remote control (32 pieces) including:
1) ШР-110-І - 5 pieces.
2) ШР-110-ІІ -6 pieces.
3) ЛР-110 -9 pieces
4) ОР-110 -12 pieces
  • replacement of current transformers (14 pieces)
  • replacement of voltage transformers (4 pieces)


  On OSG 110 kV there were replaced 80% of damaged line ferroconcrete portals by metallic portals. Due to the limited space of OSG-110 kV, the technology of installation of metallic portals made from formed section manufactured by Kromiss Biss was applied.
In May 2012 before holding of EURO-2012 the autotransformer AT-3330/110/10 kV with capacity 200 MBA was energized and reconstruction of existent firefighting pump station and chamber of firefighting pipeline valves for AT were performed. There was constructed ISG-10 kV for AT-3 with installation of cabinets for Packaged Transformer Substation-10 kV, current limiter reactors.
There was installed auxiliary transformer (AuxT-3) with connection to existent power network 0,4 kV. There was built additional building of substation control room (SCH №2) with installation of new panels of relay protection, automation and devices of automatic process control system and also there were installed the second storage battery which consist of 104 elements, auxiliary board, and DC board. There was performed reconstruction of structures and water supply networks of substation, firefighting water supply networks with arrangement of additional tank for water storing. The volume of this tank – 150 m3.
Reconstruction of water and oil disposal system for firefighting of AT with construction of closed oil collectors 2x110 m3 was performed.
There was replaced external metallic barrier by ferroconcrete one.
Construction of approach road to substation and reconstruction of on-site road along Plantwide control room 1 and Plantwide control room -2 were performed.
There was performed rice of connection cable SS 330 kV “Severnaya” – Tsentralnaya (Kyiv) for organization of backup connection channels.
Photo
 Construction of kindergarten in Protsev village in Borispil area of Kyiv region
Construction works There was completed arrangement brickwork of external and internal walls, partitions, arrangement of roof by metal tile.
Photo
 Dnistrovska pump-storage plant
Construction, electrical installation work, installation of equipment Installation of light towel
Installation of cubicle switchboard-330 kV
Installation of flexible bus arrangement of high frequency rejectors of OSG-330 kV
Photo
Construction of shopping and office complex with public facilities and parking on Sportivnaya square 1 in Pechersk district of Kyiv Electrical installation work, installation of equipment Installation of lighting network in corridor of office part.
Installation of barrage lights on roof of office building. Painting of cable networks by fire protection materials.
Installation work on cable floor.
Photo
Expansion of SS 750/330 kV “Kyivskaya” Construction, electrical installation work, installation of equipment  Expansion works are implementing on substation that is into operation. There was performed the complex of works under construction of following buildings:
- indoor transformer substation 10 kV (ITS-10 kV) – for creation of power supply for auxiliary needs
- building of relay panels №1 (BRP-1) – for arrangement of relay protection panels, control of circuit breakers OSG-750 kV, AC auxiliary board.
- united building for repairing and operating purpose - for arrangement of HV equipment workshop, laboratory of static and dynamic tests, laboratory of HV tests, chemical laboratory, fitter's shop – performed installation of foundations and 40% of brickwork of walls.
- building for repairing of SF6 equipment - provides arrangement of working rooms for repairing of SF6 equipment.
- Chambers for switching of valves №2 and №4
- There were installed foundations for group of reactors with construction of fireproof partitions between reactors and arrangement of dry-piped plant.
- There were performed installation of 5 single phase reactors with voltage 750 kV
- There were performed all foundations for portals and equipment 750 kV
- There was installed upper bus arrangement made from hollow aluminum wire with cross-section 500 mm2 (ПА-500)
- There was completed 85% earthing of territory of OSG-750 kV in form of netting made from round steel profile with cross section 16 mm and with additional electrodes diameter 16 mm and length 5m
- There was completed laying of crushed rock on substation’s territory (total area 80 000 m2)
- Firefighting pipeline. There were laid firefighting pipeline networks from extended network B2 to switching valves chambers №2 and №4
Oil outlets:
There were constructed oil collectors for collection of emergency discharge of oil in case of fire under reactors of bays №5, №2 as well as construction of closed oil outlet system with its connection to existent system.
Repairing and operating office in Korosten city
There were completed following construction works:
-construction of two floors administration and production building
-arrangement of ferroconcrete barrier around the site territory
There were completed laying of pipelines and networks:
-external networks of cold water supply and firefighting pipelines
Development of design estimate documentation
“Overhead power transmission line 750 kV Zaporozhskaya NPP – SS 750 kV Kahovskaya with stopping of Overhead power transmission line 330 kV” . Start-up complex №3 (Reconstruction of SS 330 kV “Novokahovskaya” with replacement of AT 220/150/35 kV by AT 330/220/35 kV)
Design works Customer – SE “NPC “Ukrenergo” South Power Grid
Working documentation: reconstruction of existent substation 330/220/150/35/6 “Novokahovskaya” in full scope, including:
-replacement of power equipment 330,220,150,35,6 kV
-replacement of autotransformer AT-1 220/150/35 kV by autotransformer 330/220/35 kV with capacity of 250 MBA
-installation of two power transformer 150/35/6 kV with capacity of 63 MBA each of them.
-full reconstruction of relay protection system, automatic and accounting system of substation
-development of new modern automatic control system of substation
-construction of building for repairing of SF6 equipment, relay panels building, substation control room, ISG-35/6 kV
-full replacement of all control cables and power cables of consumers 35, 6 kV
-arrangement of new auxiliary system of substation with installation of three power transformers with capacity of 1000 kBa each of them and auxiliary board
-replacement of storage batteries and installation of new DC board
-reconnection of existent overhead line 220 kV “Titan” to new OSG-220 kV
The working documentation was developed in full scope and transferred to customer.
Correcting of design “Power transmission lines 750 kV for transmission of power from Rovenskaya and Khmelnickaya NPP: overhead line 750 kV Rovenskaya NPP – Kyivskaya with expansion of SS 750 kV “Kyievskaya”and stopping overhead line 750 kV
Design works Customer - NPC” Ukrenergo”. Central PG
Design: There were developed 9 start up complexes for realization of site construction. Namely :
• The first start up complex: apartment building in small town Makarov
• The second start up complex: repairing and operating office in Sarny city
• The third start up complex: repairing and operating office in Korosten city
• The fourth start up complex: repairing and operating office in Novograd-Volynskiy city
• The fifth start up complex: fiber-optic line of communication in overhead ground-wire cable along the rout of overhead line 330 kV Rovenskaya NPP –Grabov-Rovno-Khmelnickaya NPP
• The sixth start up complex: stopping of overhead line 750 kV Khmelnickaya NPP-Chernobylskaya NPP to SS 750 kV “Kyievskaya”
• The seventh start up complex: line operating radio communication for maintenance of OHL 750 kV
• The eighth start up complex:OHL750 kV Rovenskaya NPP – SS 750 kV “Kyivskaya”
• The ninth start up complex: expansion of SS 750 kV “Kyivskaya”
The working documentation was developed in full scope and transferred to customer.
Reconstruction of SS 330/150 kV “Dniprodzerzhinska”
Design works Customer - NPC” Ukrenergo”. Dneprovskaya PGS
Working design:
• Full reconstruction of OSG 330kV and 150 kV with replacement of power equipment
• Reconstruction of automatics control of circuit breakers 330 kV and 150 kV with installation of new cabinets of automatics
• Full replacement of all control and 0,4 kV AC/DC auxiliary power cables
• Construction of new building for relay panels
The working documentation was developed in full scope and transferred to customer
Reconstruction of SS 330/150 kV “Pivdenna”
Design works  Customer - NPC” Ukrenergo”. Dneprovskaya PGS
Working design:
• Full reconstruction of OSG 330kV and 150 kV with replacement of power equipment
• Reconstruction of automatics control of circuit breakers 330 kV and 150 kV with installation of new cabinets of automatics
• Full replacement of all control and 0,4 kV AC/DC auxiliary power cables
• Construction of new building for relay panels
The working documentation was developed in full scope and transferred to customer
Objects of civil engineering and transport infrastructure near the Parkova road in Kyiv. External power supply networks
Design works  Customer – LLC “Osnova –Solsif”
Design, working design documentation:
• Laying of two cable lines 10 kV from SS 35/10 kV “Arsenalnaya” to distribution point 10 kV for external power supply of object.
• Reconstruction of bays 10 kV in ISG-10 kV of SS 35/10 kV “Arsenalnaya”
The design and working design documentation were developed in full scope and transferred to customer .
Improvement of power supply scheme for tobacco factory OJSC “Tobacco factory Priluky”
Design works Customer – PrJSC “JSC tobacco company V.A.T. Priluky”
Working design:
• Construction of new substation 35/10 kV “Tobacco factory”
• Laying of cable line 35 kV from SS 110/35/10 kV “Priluky” to new SS 35/10 kV “Tobacco factory”
• Reconstruction of SS 110/35/10 kV “Priluky”
• Reconstruction of internal power supply networks 10 kV of tobacco factory.
There were received positive conclusions of Gosenergonadzor, Gosgorpromnadzor, and PJSC “Chernigivoblenergo”. Working design was developed in full scope and transferred to customer

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07301
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.