22.12.2017 Congratulations on the Day of Powerman! ( Day of Power Engineering Specialist! )
·
15.12.2017 For the attention of shareholders PJSC "SVS-Dnipro"
·
06.12.2017 Notification of the emergence of special information of the issuer
·
30.10.2017 For the attention of shareholders PJSC "SVS-Dnipro"
·
20.06.2017 Notification of the emergence of special information of the issuer
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2015 projects
2015 projects
Name of project/Type of works Specification

Dnistrovska

pumped-storage hydro station (PSHS)

Construction works,

electrical installation works

In 2015 specialists of  LLC “KECC”  performed installation of main electrical connections of hydroelectric unit №3, viz:

  • installation of XYSR 0.628 ohm/3400A and XYSR 0.251 ohm/2300A reactor manufactured by ALSTOM company
  • installation of excitation system manufactured by ABB company, consisting of 2885 kVA (15750/884 V) transformer and excitation panel
  • connection and putting into operation of ТDTs-430000 kVA, 347/15,75 kV block transformer
  • installation and putting into operation of HECS 130 XL, 25,3 kV 18 000 А, 130 кА generator circuit breaker and НECPS-5Sp 24 kV disconnector, HGI 3 21 kV SF6 circuit breakers manufactured by ABB company
  • installation of hydroelectric unit control system manufactured by ANDRITZ HYDRO company and vibration control system
  • installation of relay protection and automation panels of GIS 330 kV and hydroelectric unit № 3 bays
  • installation of power supply for ventilation system
  • installation of cable metal structures manufactured by BAKS company
  • installation of power and control cables
  • installation of secondary wiring
  • installation of power supply for fire extinguisher system.

To ensure normal operation of hydroelectric units № 1, 2, 3 of the Dniester pumped-storage power plant, there were executed works and put into operation several auxiliary facilities, viz:

  • 4 cars fire station
  • security facilities and external lighting system
  • surface-water flow and drainage water pump station in Vasilyevka village with 6kV cable line and 6/0,4 kV S/S
  • headwater pond lighting with the length of 7 km.
  • indoor stockroom

4 engineers and 40 persons of installation staff were simultaneously involved in commissioning works on the site.

Photo

330 kV SS «Vinnitskaya»

Construction works,

electrical installation works

Name of facility: “Reconstruction of 330 kV SWYD on 330 kV SS “Vinnitskaya". 

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”

Scope of Work: Modification of working design under the project “330 kV SS “Vinnitskaya”. Reconstruction of 330 kV SWYD, including the supply of equipment, execution of construction, electrical installation and commissioning works.  

The set of construction, installation and commissioning work and supply of the equipment under the project includes the following reconstruction:

  • Replacement of 330 kV circuit breakers and current transformers in bays “3V”, “4V”, “5V”, “6V” with SF6 ones;
  • Replacement of 330 kV voltage transformers in bays 330 kV OHL “Vinnitskaya-750”, 330 kV OHL “Ladyizhinskaya TPP”, 330 kV OHL “Bar” with SF6 ones, and installation of new SF6 voltage transformers “1SSh-330 kV” and “2SSh-330 kV";
  • Replacement of twelve 330 kV bus supports and installation of additional fifteen 330 kV bus supports in existing bays;
  • Replacement of line traps in bays 330 kV OHL “Vinnitskaya-750”, 330 kV OHL “Bar";
  • Installation of two sets of new 330 kV single-pole disconnectors TN “1SSh-330 kV” and “2SSh-330 kV";
  • Installation of 3 phases of 330 kV surge arresters;
  • Replacement of existing 330 kV disconnectors’ motor drives in the amount of 9 pieces;
  • Reconstruction of 330 kV SWYD bioshield, grounding and external lighting;
  • Installation of cable trays, cabling and wiring products.
  • Installation of 9 phases of 330 kV coupling capacitors complete with connection filters and ground terminals;
  • Installation of units (supports and metallic structures) and external installation cubicles (YaОV-4-3 pcs., YaPV1/4-4 pcs., YaК-95/35/5-4 pcs., ShUR-22 pcs., YaZN-1А-5 pcs, YaZSh-1А-2 pcs., ShRP-4-2 pcs., YaZV-90-4 pcs., YaZV -120-4 pcs., PR85-2 pcs., YaZ-2 pcs);
  • Installation of automation panels V-330 kV “3V”, “4V”, “5V", "6V"
  • Installation of main protection panels, equipped with microprocessor devices L040 “Diamant” on the side of 330 kV SS “Vinnitskaya” and from the side of SS 750 kV “Vinnitskaya”
  • Installation of backup protection panels L-330 “Ladyizhinskaya TPP”, “Bar”, “Vinnitskaya 750" with microprocessor-based devices REL670
  • Installation of DZO-330 kV 1SSh-330 kV, 2SSh-330 kV panels with REB670 microprocessor-based devices and DZO -330 kV  1 SSh -330 kV, 2 SSh -330 kV panels based on electro-magnetic relay
  • Installation of L-330 kV “Ladyizhinskaya TPP”, “Bar”, “Vinnitskaya 750” emergency automation panels with microprocessor - based devices FOL «Diamant»
  • Installation of L-330 kV “Ladyizhinskaya TPP” command-transmission device emergency automation panel with AKA-16 “KEDR” device
  • 330 kV SWYD site improvements

As of 29.12.2015 adjustment of working documentation is ongoing

Scope of Work: The set of works on the replacement of 110 kV SWYD equipment under the project “330 kV SS “Vinnitskaya”. Reconstruction of 110 kV SWYD, including the supply of equipment, execution of construction, electrical installation and commissioning works.  

The set of construction, installation and commissioning work and supply of the equipment under the project includes the following reconstruction:

  • Replacement of the existing 110 kV current transformers with SF6 ones, including supply of the equipment, execution of construction, installation and commissioning work in “Tyushki”, “Zapadnaya”, “Ukrflora”, “Vinnitskaya-750”, “Tulchin”, “Sutiski”, “Vostochnaya” “Novaya”, “Yuzhnaya”, “Agronomicheskoe”, “Nemirov”, “AT-1”, “AT-2”, “OV” and “ShSV” bays;
  • Replacement of 3 existing 110 kV voltage transformers “2SSh”and installation of 1 new 110 kV voltage transformer in the “OSSh";
  • Dismantling of 3 phases of 110 kV arrester and installation of 3 phases of 110 kV surge arresters;
  • Installation of cabling and wiring products;
  • Installation of low-voltage equipment in existing panels;

As of 29.12.2015 purchasing of the equipment for execution of the above mentioned works is ongoing

330/110/10 kV SS «Novokievskaya»

Construction works,

electrical installation works

“Modification of construction documents, engineering drawings and accomplishment of construction works under the project “Reconstruction of 110 kV SWYD on 330/110/10 kV SS «Novokievskaya»". 

Employer: SE “NPC “Ukrenergo”, separated division “Central power grid”

Scope of Work: Modification of working design under the project “Reconstruction of 110 kV SWYD on 330/110/10 kV SS «Novokievskaya», including supply of the equipment, execution of construction, electrical installation and commissioning works.  

The set of construction, installation and commissioning work and supply of the equipment under the project includes the following reconstruction:

  • Replacement of 110 kV circuit breakers in existing bays № 1 (Tarasovka-1), № 3 (AT-2), № 6 (AT-1) and № 7 (Dneprovskaya) with SF6 ones;
  • Replacement of 110 kV current transformers in existing bays № 1 (Tarasovka-1), № 1a (Tarasovka-2), № 3 (AT-2), № 6 (AT-1), № 7 (Dneprovskaya), № 9 (ShZV-110-1), № 14 (Teremki-1), № 15 (OV-110-II) and № 17 (Nikolskaya-1);
  • Installation of 110 kV equipment in new bays № 1v (OV-110-I), № 1b (Chabanyi-1), № 10 (Bus devices110 -II), Nos. 11-12 (Sectioning of I-III and II-ÌV bus bars), № 19 (Chabanyi-2), № 20 (Bus devices-110-III), № 21 (CL-110 Odesskaya-1), № 22 (CL-110 Odesskaya-2), № 23 (TN-110 kV OSSh-II, ShZV-110-II) and № 24 (AT-3);
  • Installation of 8 bus bar and 2 linear gantries;
  • Arrangement of 4 new lightning rods on poles SK-26 and reconstruction of 3 existing ones;
  • Reconstruction of 110 kV SWYD grounding and external lighting;
  • Installation of cable trays, cabling and wiring products.
  • Installation of 28 relay protection and automation panels in the existing premises of substation control building
  • Completion of works on arrangement of interior and exterior finishing of the extension to substation control building;
  • Arrangement of heating and fire alarm systems of the extensions to substation control building;
  • Arrangement of telemechanics and metering systems.
  • Replacement of control panels in main control panel
  • 110 kV SWYD existent fencing reconstruction
  • Arrangement of roads, landscaping and improvement of 110 kV SWYD

As of 29.12.2015 high-voltage equipment of 110 kV SWYD and relay protection and automation microprocessor-based devices were delivered        

330 kV SS «Kamyanets-Podolska»

Construction works,

electrical installation works

Technical reequipment of 35kV SWYD and installation of 35 kV shunting reactor on 330 kV SS “Kamyanets-Podolska” in Khmelnitskiy region / І stage: 35 kV SWYD existing equipment replacement.

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”

Scope of Work:  The set of works, including adjustment of working design. Reconstruction of 35kV SWYD , supply of equipment, execution of civil works, electrical installation and commissioning works.

Commencement of works: September16, 2015

Completion of works: December 24, 2015

Reconstruction of 35 kV SWYD comprised a set of construction and installation works, commissioning works, including delivery of equipment, viz:

  • SWYD 35 kV, reconstruction of building part (13 bays). Works were performed step-by-step, without consumers deenergizing.
  • 35 kV SWYD and 110 kV SWYD, reconstruction of integrated cable system, including complete replacement of the old cable trays with new ones.
  • 35 kV SWYD existing equipment dismantling and installation of the following equipment:
  • 35kV vacuum circuit breaker, type VB4-P-35-25/1250 UKhL1 (АВМ «Amper») -9 pcs.
  • 35kV disconnector, type RD (3)-2-35/1000 UKhL 1(АВМ «Amper») -12 pcs.
  • 35kV disconnector, type RD (3)-1-35/1000 UKhL 1(АВМ «Amper») -8 pcs.
  • 35 kV current transformer, type ТРО 7 1000/5 А (АВВ) - 9 pcs.
  • 35 kV current transformer, type ТРО 7 200/5 А (АВВ) - 18 pcs.
  • 35 kV voltage transformer, type ТJО 7 (АВВ) - 6 pcs.
  • 35 kV Surge arresters, type ОPN-P-35/41/10/550-03 (Slavènergoprom, LLC) - 6 pcs.
  • Dismantling of existing construction parts and installation of new construction parts for new equipment.
  • Installation of relay protection and control panels - 9 pcs.
  • Installation of cable trays, cabling and wiring products.
  • Equipment testing and commissioning works.

As of 25.12.2015 all the equipment of 35 kV SWYD was completely installed and put into operation.

Photo

SS 750/330 kV «Kakhovska»

Construction works,

electrical installation works

“Construction of SS 750/330 kV Kakhovska, Lot 2: supply and installation of АТ1 1000 MVA and corresponding infrastructure”.

In September 2015 there were performed foundations for 15,75 kV covered busducts for connection of AT-1 and PST-1 phases

(arrangement of solid-cast reinforced concrete foundations for bus ducts, as well as foundations for autotransformers A-1, AT-2 and AT-3 fire extinguishing system)

Photo

750 kV SS «Donbasskaya»

Construction works,

electrical installation works

Contract UE / 004. Relay protection and automation for 750 kV substations. 750 kV SS “Donbasskaya”.

 As of from July 2015 to December 2015 there was performed set of works on relay protection and automation with commissioning of:

750 kV SWYD.

  • Circuit breaker EV-750 of АТ-2 from II busbar - the second set of REC-670
  • Circuit breaker EV -750 of АТ-3 from I busbar - 1 and 2 sets of REC-670 
  • Circuit breaker VV-750 of АТ-4 from I busbar - 1 and 2 sets of REC-670 
  • Bus differential protection of II busbar - 1 and 2 sets of REB-670
  • Reconstruction of the main and backup protections of AT-4 and PST (750/330 kV).
  • Reconstruction of AT-4 750 kV and 330 kV leads differential protection

500 kV SWYD.

  • Circuit breaker EV-500 Novodonbasskaya from I busbar - 1 and 2 sets of REC-670   (to be commissioned in December 2015)
  • Circuit breaker VV-500 Novodonbasskaya from II busbar - 1 and 2 sets of REC-670.

330 kV SWYD.

  • Circuit breaker VV-330 of АТ-4 from I busbar - 1 set of REC-670
  • Circuit breaker VV-330 SOV-UTES 2+АТ-4 - 1 set of REC-670 (was commissioned in December 2015)

110/10 kV SS «Berkovetskaya»

Construction works,

electrical installation works

Construction of 110/10 kV SS “Berkovetskaya”.
Employer:  LLC "SEC Lavina"

Scope of work:  The set of construction, electrical installation and commissioning works on    construction of a new electrical substation 110/10 kV     

                          “Berkovetskaya” and its connection to the existing 110 kV OHL including

                          arrangement of combined 110 kV OHL-CL and facility

                          commissioning.
                          Development of full set of working documentation for this facility 

                          is ongoing under a separate contract.
Works commencement date: 01.10.2015.
Accomplishment date: 15.06.2016.

The set of building works for this facility includes accomplishment of construction part of substation in full scope, viz:

  • arrangement of foundations and oil receivers for installation of two 110/10 kV power transformers;  - arrangement of foundations for installation of 110 kV SWYD equipment; 
  • arrangement of foundations and oil receivers for installation of four 10 kV arc suppression coils; 
  • construction of 130 m3 oil receiver; 
  • arrangement of foundations for 10 kV cubicle switchboard and substation control house:
  • arrangement of foundations for the installation of auxiliary equipment;
  • construction of oil drain facility and cable channels on the territory of the substation;
  • arrangement of external fencing and a set of landscaping and gardening works on the territory of substation.

The set of electrical installation and commissioning works for the facility includes the following:

  • installation and commissioning of the equipment for 110 kV SWYD (PASS MO 145, manufactured by АВВ company)
  • installation and commissioning of two 110/10 kV power transformers with capacity of 40 MVA each;
  • installation and commissioning of 10 kV bays in the building of 10 kV closed cubicle switchboard;
  • installation and commissioning of substation’s auxiliary system (auxiliary transformers  DC and AC boards);
  • arrangement of 10 kV busbar bridge for providing of power supply from power transformers to 10 kV closed cubicle switchboard incoming cubicles using of 10 kV CL;
  • laying of power (voltage up to 10 kV and 1 kV) and control cables on the territory of substation;
  • installation of substation's outdoor illumination, lightning protection and grounding systems;
  • installation and commissioning of relay protection and automation equipment (automation panels and  control and protection microprocessor devices);
  • works on arrangement of automatized revenue metering system, control communication system, video surveillance and access control systems, fire extinguishing and fire alarm systems on the territory of substation;
  • installation and commissioning of substation’s SCADA system.

As of 25.12.2015:

  • arrangement of foundation and oil drain facility for the first 110/10 kV power transformer has finished, for the second one - is ongoing;
  • civil work under construction of 130 m3 oil receiver has finished;
  • works under arrangement of foundations and oil receivers for installation of four 10 kV arc suppression coils has finished;
  • arrangement of foundations for installation of the equipment for 110 kV SWYD, 10 kV closed cubicle switchboard and substation control building is ongoing.

SS «Mototsikletnaya»

Construction works,

electrical installation works

Reconstruction of pulling chambers, including arrangement of new reinforced concrete foundations for cable joints in the premises of the transformers T-1, T-2.

Heat energy meters

Construction works,

electrical installation works

Heat energy meters (investment program 2015).

There were performed design works for 300 pcs. of heat energy meters;

There were installed 317 pcs. of heat energy meters.

Photo

OHL-CL SS «Oktyabrskaya» - PZU31 -

SS «Mototsikletnaya»

Construction works,

electrical installation works

Reconstruction of combined OHL-CL SS “Oktyabrskaya” - PZU31 - SS “Mototsikletnaya”№1, 2” Stage 1 (2015).

There was performed set of works on replacement of 110 kV oil filled cables with XLPE cable with total length of 5 680 LM.

Photo

Shopping center on Architect Verbitskiy street

Construction works,

electrical installation works

Shopping center with social services facilities and parking on Architect Verbitskiy street in Darnytskyi district in Kiev city. External power supply. Stage 1 (2015).

 there was performed set of works on 10 kV XLPE cable laying with total length of 6 000 LM.

Construction of residential house on 1, Komarova av - 2A, Mihaila Dontsa str.

Construction works,

electrical installation works

Works on construction of utility networks (energy facilities) as part of project “Construction of residential house with integrated administrative premises on 1, Komarova av - 2A, Mihaila Dontsa str. in Solomenskiy district in Kyiv city.

  • there was performed set of works on 10 kV XLPE cable laying;
  • there was performed set of works on construction of pipe-type cable;
  • there was performed set of works on 0,4 kV cable laying (sections 6, 7, 8).

Photo

Development of design estimate documentation

Construction of 110 kV cable line “Novokievskaya - Moscowskaya № 1, 2”

Design works

  • Employer - PJSC "Kyivenergo."

  • Design stage - working design.

  • Brief description of ongoing design works - construction of two new 110 kV cable lines from 330 kV SS “Novokievskaya” to 110 kV SS “Moscowskaya” with approach line at 110 kV SS «Odesskaya». The total length of new 110 kV cable lines is 14,050 km. Cable type - XRUHKXS-WTC 1x1400/150 64/110kV, manufactured by TF Cable company.

  • Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received.

Shopping center with social services facilities and parking at Architect Verbitskiy street in Darnytskyi district in Kiev city.  External power supply

Design works

  • Employer - LLC “UKRAINIAN CONSTRUCTION AND INVESTMENT COMPANY ”UKRBUDINVEST".

  • Design stage - basic design, working documentation.

  • Brief description of ongoing design works - external power supply of shopping center with a total load of 2 535,4 kW. The following works were performed as a part of project: reconstruction of two 10 kV bays at 110 kV SS “Kharkivska”; laying of two 10 kV cable lines from 110 kV SS “Kharkivska” to DB 339 with a total length of 1850 m each; reconstruction of two 10 kV bays in DB 339; laying of two 10 kV cable lines from DB 339 to the new 10/0,4 kV TS with a total length of 200 m each; construction of in-built 10/0,4 kV TS with four transformers with capacity of 1000 kVA each; laying of two 10 kV cable lines from the new 10/0,4 kV TS to the existing 10 kV TS with a total length of 700 m each; removal of existing 10 kV cable lines (8 pieces) and 0,6 kV cable lines (14 pieces) beyond construction zone.

  • Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. Engineering solution from PJSC “Kyivenergo” was received without comments.

Construction of substation 750/330 kV Kakhovska, Lot 2: supply and installation of АТ1 1000 MVA and corresponding infrastructure

Design works

  • Employer - SE “NPC “Ukrenergo”.

  • Design stage - working documentation.

  • Brief description of ongoing design works: installation of three phases of 750/330 kV AT with capacity of 3 x 333 MVA, installation of three 110 kV phase-shifting transformers with capacity of 3 x 92 MVA, installation of 15,75/10 kV auxiliary transformer with capacity of 2 500 kVA and related infrastructure.

  • Stage of design work execution - working documentation was developed in full scope and delivered to the Employer.

Shopping center “Lavina”, on 6, Berkovetskaya street in Kyiv city. External power supply

Design works

  • Employer - LLC “Megaline Global Ukraine".

  • Design stage - basic design, working documentation.

  • Brief description of ongoing design works - construction of a new 110/10/10 kV substation “Berkovetskaya”, laying of two 110 kV cable lines by branch line from the overhead lines “Severnaya- Irpen №3”, “Severnaya - Belichi”, laying of 10 kV cable lines for power supply of built-in 10 kV transformer substations of the “Lavina” shopping center, laying of fiber-optic communication line from SS “Belichi” to SS "Berkovetskaya".

  • Stage of design work execution - development of design documentation is ongoing.

Reconstruction of PJSC “Ukrinbank” main office power supply system, located at the address: 10A, Smirnova-Lastochkina str., Kyiv

Design works

  • Employer - PJSC "Ukrainian Innovation Bank".

  • Design stage - working design.

  • Brief description of ongoing design works - reconstruction of PJSC “Ukrinbank” main office power supply system with increasing of its load up to 225 kW. The following works are performing as a part of project: reconstruction of switchboard room of the building, including installation of the second 0,4 kV switchboard and bringing revenue metering system in a compliance with valid regulations, including introduction of LUZOD system (local equipment for data collection and processing), laying of two new 0,4 kV cable lines from TS 7093 to the building’s switchboard with a total length of 160 m each.

  • Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. Engineering solution from PJSC “Kyivenergo” was received without comments.

Field supervision for project “Reconstruction of combined OHL-CL SS “Oktyabrskaya” - PU31 - SS “Mototsikletnaya”№1, 2”

Design works

  • Employer - PJSC "Kyivenergo."

  • Brief description of ongoing construction and installation works, that are the subject of field supervision - reconstruction of two existing 110 kV combined OHL-CL from 330 kV SS “Oktyabrskaya” to 110 kV SS “Mototsiklektnaya” including replacement of OHL section of 330 kV SS «Oktyabrskaya»-PU-31 and oil filled cable from PU-31 to SS “Mototsiklektnaya” with 110 kV XLPE cables. The total length of new 110 kV cable line is 3,8 km each.

Shopping center, concert hall, hotel and underground parking at 11, Zlatoystovskaya str., 6, 8, 8A, 8B Pobedyi av. in Shevchenkovskiy district, Kyiv

Design works

  • Employer: PJSC ”NEST-HANNER”.

  • Design stage - working documentation.

  • Brief description of ongoing design works - external power supply of shopping center with a total load of 12000 kW. The following works are performing as a part of project: transferring of power supply of 35/10 kV SS “Lvovskaya” to 330 kV SS “Oktyabrskaya”. Transferring of power supply of 35/10 kV SS “Artemovskaya” to 110 kV SS “Kabelnaya” including reconstruction of cable lines 35 kV. Construction of built-in 10 kV DP and 10/0.4 kV TS having their power supply from 10 kV CL from 35 kV SS “Artemovskaya”, including reconstruction of 10 kV bays at 35 kV SS “Artemovskaya”.

  • Stage of design work execution - due to termination of funding, development of design documentation is temporarily suspended.

“Modernization of power accounting system on integrated transformer substation (ITS) - 5720 located at 6, Pobedyi av. in Shevchenkovskiy district, Kyiv”

Design works

  • Employer - PJSC “NEST-HANNER”.

  • Design stage - working design.

  • Brief description of ongoing design works: bringing into compliance of ITS - 5720 accounting system with requirements of metrological characteristics, Electrical installation code and Rules on Electric Power Usage, including installation of separate accounting board at consumers’ battery limit.

  • Stage of design work execution - working documentation was developed in full scope and agreed with PJSC “Kyivenergo”.

Residential complex with integrated and extended social premises and parking at 3, Trytenko str., Kyiv city.  External power supply networks

Design works

  • Employer: LLC «UKRPROMMETTORG».

  • Design stage - working documentation.

  • Brief description of ongoing design works - external power supply of residential complex with a total load of 1 458,2 kW. The following works are performing as a part of project: construction of built-in 10/0,4 kV TS. Construction of four 10 kV CL, with a total length of 1,5 km. Construction of 0,4 kV pipe-type cables network on the territory of the residential complex.

  • Stage of design work execution - due to termination of funding, development of design documentation is temporarily suspended.

Reconstruction of heating main No. 1 “Otradnyiy” district boiler house on the section from TK 138a to the fixed support between ТК 140 and ТК 141 at 27, V. Getmana street in Kyiv

Design works

  • Employer - PJSC "Kyivenergo."

  • Design stage - working design.

  • Brief description of ongoing design works: reconstruction of existing heating network, including replacement of pipelines 500 mm with new ones, 600 mm in diameter, with a total length of 330 m.

  • Stage of design work execution - development of working documentation is ongoing.

Field supervision for project “750 kV overhead transmission lines for delivery of power from Rovenskaya and Khmelnitskaya NPPs: 750 kV OHL Rovenskaya NPP - Kievskaya with an extension 750 kV SS “Kievskaya”and 750 kV OHL approach lines

Design works

  • Employer - SE “NPC “Ukrenergo”.

  • Brief description of ongoing construction and installation works, that are the subject of field supervision - extension of 750 kV SWYD for connection of two 750 kV OHL from Rovenskaya and Khmelnitskaya NPPs including installation of 3 CBs, two groups of 750 kV shunting reactors on OHL from Rovenskaya and Khmelnitskaya NPPs with capacity of 3x110 MVAr, two 750 kV CBs for two groups of 750 kV shunting reactors. It is planned construction of the following facilities: 750 kV relay house RH №1, oil facilities operator’s room, auxiliary facilities (repair and maintenance personnel building, SF6 equipment repairing building), two groups of 750 kV shunting reactors automatic fire extinguishing valves chamber, building protection class is IV.

Reconstruction 10 kV electrical power network of DB-292

Design works

  • Employer - PJSC "Kyivenergo."

  • Design stage - working design.

  • Brief description of ongoing design works: laying of 10 kV CL from SS «Kabelna» to DB-292 with a total length of 3,5 km; laying of 10 kV CL from SS “Obolon” to DB-292 with a total length of 2,27 km; replacement of 10 kV current transformers in 10 kV bays on SS “Obolon” and DB-292; calculation of relay protection settings for RPA existing devices.

  • Stage of design work execution - design documentation was developed in full scope, delivered to the Employer and submitted to SE “Ukrgosstroyekspertiza” for comprehensive state examination.

Technical reequipment of 35 kV SWYD and installation of 35 kV shunting reactor on 330 kV SS “Kamianets-Podilska”, Khmelnytskyi region / 1 stage: 35 kV SWYD existing equipment replacement

Design works

  • Employer - SE “NPC “Ukrenergo”.

  • Design stage - working design.

  • Brief description of ongoing design works: complete replacement of 35 kV SWYD existing electrical equipment, viz: 35 kV circuit breakers- 9 pcs., 35 kV disconnectors - 20 pcs., 35 kV surge arresters - 6 pcs., 35 kV current transformers - 27 pcs., 35 kV voltage transformers - 6 pcs.

  • Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received.

Residential complex at 30, Mihaila Grushevskogo str., Kyiv city. External power supply networks

Design works

  • Employer - LLC “Real estate agency services."

  • Design stage - basic design, working documentation.

  • Brief description of ongoing design works - external power supply of residential complex with a total load of 1 552,5 kW. The following works were performed as a part of project: construction of built-in 10/0,4 kV transformer substation with 4 dry transformers with a capacity of 1000 kVA each; laying of 10 kV CL from TS-977 and TS-1213 to 10/0,4 kV TS, which is under design; laying of 10 kV CL from TS-201 and DB-41 to 10/0,4 kV TS, which is under design; laying of 10 kV CL from DB-41 to TS-1686, laying of 10 kV CL from DB-5 to TS-1213, installation of ITS for providing of power supply to construction machinery; laying of 10 kV CL to ITS from TS-977 and TS-1213; dismantling of the existing TS-602; switching of TS-602 0,4 kV construction machinery existent consumers to ITS with their following switching to 10/0,4 kV TS (after accomplishment of construction and ITS dismantling); reconstruction of DB-41, including installation of two new 10 kV bays; reconstruction of 10 kV switchgear of TS-201, TS-977, TS-1213, TS-1686, including replacement of existent disconnectors BP type with load break switches ВН-16 type, in bays, where the cables, laying under the project are connected.

  • Stage of design work execution - basic design was developed in full scope, delivered to the Employer and agreed with PJSC “Kyivenergo”. Working documentation is under development.

Construction of social and trade center at 36, Moscowskiy av. in Obolonskiy district in Kyiv city. Power electrical equipment and electric lighting

Design works

  • Employer - LLC “Extreme Ltd”.

  • Design stage - basic design, working documentation.

  • Brief description of ongoing design works - development of design documentation for indoor power electrical equipment and electric lighting of shopping center with total area of 192 628,00 m2, total load is 16 160,00 kW. The following works were performed as a part of project: construction of two built-in 10 kV distribution centers with transformer substations (4 dry transformers each) and three built-in 10/0,4 kV transformer substations with 4 dry transformers each. The total number of 10/0,4 kV transformers - 20 pcs. with a capacity of 1600 kVA each. Installation of indoor 0,4 kV power distribution networks and lighting network.

  • Stage of design work execution – basic design was developed in full scope and delivered to the Employer. Working documentation is under development.

Development of working design for installation of heat metering devices on inputs of residential houses

Design works

  • Employer - PJSC "Kyivenergo."

  • Design stage - working design.

  • Brief description of ongoing design works - installation of heat energy meters for heating system of residential buildings in Kiev, 300 units totally.

  • Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Construction of thermal power plant with a capacity of 7.5 MW at the address: Karpilovka village council, Kozeletskiy district, Chernigov region

Design works

  • Employer - LLC “Desnianskaya THPP”.

  • Design stage - feasibility study, basic design, working documentation.

  • Brief description of ongoing design works - development of design documentation for thermal power plant with a capacity of 7,5 MW.

  • Stage of design work execution - feasibility study developed in full scope and delivered to Employer. State examination of sanitary and epidemiological welfare of the public, ecology and operational safety was passed and positive evaluation report was received. Basic design is under development.

Relay protection and automation for 750 kV Substations (adjustment)

Design works

  • Employer - SE “NPC “Ukrenergo”.

  • Design stage - working design.

  • Brief description of ongoing design works - the adjustment of estimated part of design documentation for reconstruction of relay protection and automation on 750 kV SS “Vinnitskaya”, 750 kV SS “Zaporozhskaya», 750 kV SS «Donbasskaya», 750 kV SS “Yuzhnodonbasskaya”, 750 kV SS «Zapadnoukrainskaya», 750 kV SS «Severoukrainska», 750 kV SS «Dneprovskaya» due to depletion of funds limit for facilities construction, inflationary factors and a significant rise in the value of foreign currency. Including cost of equipment, which was delivered by Employer by other international contracts, in estimated part of design documentation. Including additional costs related to the servicing of IBRD loan in estimated part of design documentation. Including costs for GOPA consultant services in estimated part of design documentation.

  • Stage of design work execution - estimated part of design documentation has been adjusted in full scope. State examination of estimated part of design documentation for construction was passed and positive evaluation report for all seven facilities was received.

Reconstruction of power supply for dormitory at 24, Ivana Klimenko str. in Kyiv city

Design works

  • Employer: Ministry of Internal Affairs of Ukraine.

  • Design stage - working design.

  • Brief description of ongoing design works - replacement of 0,4 kV main switchboards in the building.

  • Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Reconstruction of power supply for dormitory at 3, Martirosyana str. in Kyiv city

Design works

  • Employer: Ministry of Internal Affairs of Ukraine.

  • Design stage - working design.

  • Brief description of ongoing design works - replacement 0,4 kV of main switchboards in the building.

  • Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

330 kV SS “Vinnitskaya". Reconstruction of 330 kV SWYD with full replacement of the equipment and introduction of progressive technological solutions (adjustment)

Design works

  • Employer - SE “NPC “Ukrenergo”.

  • Design stage - working design.

  • Brief description of ongoing design works - reconstruction of 330 kV SWYD on 330 kV SS “Vinnitskaya” with replacement of: 330 kV circuit breakers and current transformers in bays ”3V”, “4V”, “5V”, “6V” with SF6 ones; “1SSh-330 kV”, “2SSh-330 kV”, 330 kV OHL “Vinnitskaya 750”, 330 kV OHL “”Lad. TPP”, 330 kV OHL “Bar” voltage transformers with SF6 ones; 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750”, 330 kV OHL ”Lad. TPP” coupling capacitors; bus-bar supports; 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750” line traps; 330 kV surge arrestors “AT-2”; 330 kV disconnector’s driving motors; installation of two sets of 330 kV TN “1SSh-330 kV” and “2SSh-330 kV”single pole disconnectors; 330 kV SWYD bioshield ; 330 kV SWYD lighting; 330 kV SWYD earthing ring.

  • Stage of design work execution - development of working documentation is ongoing.

External power supply for gymnasium at 48a, A. Ahmatovoy str. in Darnitskiy district in Kyiv city

Design works

  • Employer is the owner of the premises.

  • Design stage - working design.

  • Brief description of ongoing design works - development of design documentation for external power supply of gymnasium with a total load of 36,00 kW.

  • Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. Engineering solution from PJSC “Kyivenergo” was received without comments.

TSS at Chayka
Dnestr photo

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07300
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2017 SVS-Dnepr PrJSC . All rights reserved.