26.10.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
04.10.2018 Using the energy of the sun is a step towards the future!
·
27.07.2018 Notification of the emergence of special information of the issuer
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 19, 2018
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 18, 2018
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2016 projects
2016 projects
Name of project/Type of works Specification

110 kV SS “Brno-Opuštena” and 110 kV cable line “Brno-Trnita” in Brno city, Czech Republic

 

 

Construction works,

electrical installation works

 

 

 In the period from March to November 2016, LLC “Kyiv energy construction company” performed works on installation and putting into operation of 110 kV SS “Brno-Opuštena” and 110 kV cable line “Brno-Trnita” in Brno city, Czech Republic. The Employer is E.ON Distribuce, a.s.  
          The scope of works performed by LLC "Kyiv energy construction company" includes:
- Installation of 110 kV cable line - 6 phases, the length of each phase is 960 m (cable with XLPE insulation, copper conductor, cross section is 630mm2). The cable was installed both in subsurface and deepen cable collecting channel (Technical Networks of Brno city), including vertical shaft with a depth of around 28m. After installation of cable, there were performed works on its fixing on steel structures, arrangement of firewall protection, installation of reducing cable and earthing loop. Certified specialists of LLC “Kyiv energy construction company”, also participated in installation of 110 kV cable joint sleeves and terminations.
- Installation of 110 kV GIS manufactured by ABB company.
- Installation of 110 kV current leads between premises of 110 kV GIS and power transformers’ chambers. 
- Power transformers’ bus arrangement on 110 kV and 22 kV sides, including 22 kV busbar bridge arrangement and installation of auxiliary equipment.
- Installation of 22 kV switchgear.
- Installation of auxiliary equipment (auxiliary transformers, AС/DС boards, accumulator battery, 0.4 kV distribution boards).
- Installation of relay protection, control and automation panels.
- Installation of cable routes and cabling and wiring products (22 kV and 0.4 kV power cable and control cable).
The works have been executed according to the state technical requirements valid in Czech Republic, and considering all necessary functional tests and delivery of proper set of as-built documentation to the Employer.

Photo

330 kV SS “Vinnitskaya". Reconstruction of 110 kV SWYD with full replacement of the equipment and introduction of progressive technological solutions

 

 

Construction works,

electrical installation works

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”.
Scope of Work: Set of construction, installation and installation-setup works on reconstruction of 330 kV SWYD, including complete replacement of the equipment (works completion).
Date of the Contract signing: 15.12.2015 No 70-4/4240-15
Commencement of works: April 01, 2016
 Completion of works: July 13, 2016          
   The set of construction, installation and installation-setup works, including supply of equipment for the facility, includes the following reconstruction:
The existing equipment of 110 kV SWYD was dismantled and the following equipment was installed:
-45 pcs. of 110 kV current transformers TOG 123-II-II U1 type;
-3 pcs. of 110 kV voltage transformers NOG 123-II-II U1 type; 
-3 pcs. of 110 kV surge arrestors SB 96 type,
The following new equipment was installed:
-1 pc. of 110 kV voltage transformers NOG 123-II-II U1 type;
Installation of cabling and wiring products. Execution of commissioning works.

As of 21.09.2016, the equipment of 330 kV SWYD had been put into operation in full scope. 

Photo

330 kV SS “Vinnitskaya". Reconstruction of 330 kV SWYD, including complete replacement of the equipment and introduction of progressive technological solutions (works completion) inventory No 040418, No 200611

 

 

Construction works,

electrical installation works

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”.
Scope of Work: Set of construction, installation and installation-setup works on reconstruction of 330 kV SWYD, including complete replacement of the equipment (works completion).
Date of the Contract signing: October 02, 2015, No 70-4/3067-15, 
Commencement of works: April 01, 2016
Completion of works: September 20, 2016          
   The set of construction, installation and installation-setup works, including supply of equipment for the facility, includes the following reconstruction:
The existing equipment of 330 kV SWYD was dismantled and the following equipment was installed:
- 4 sets of 330 kV circuit breaker;
-12 phases of current transformers in bays “3V”, “4V”, “5V”, “6V";
-9 phases of SF6 voltage transformers of 330 kV OHL “Vinnitskaya 750”, “Lad. TPP”, “Bar”; 
-Coupling capacitors of 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750”, 330 kV OHL “Lad. TPP”; 
-Line traps of 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750”; 
-330 kV surge arrestors “AT-2”; 
-9 pcs. of disconnector’s driving motors R-2, RSh-6, R-6;
-13 pcs. of busbar supports.
The following new equipment was installed:
-Two pcs. of three-phase sets of “1SSh”, “2SSh” voltage transformers;
-Two sets of 330 kV single pole disconnectors of “1SSh”, “2SSh” VT;
-14 pcs. of busbar supports.
Manufacturing and installation of units (supports and metalwork) required for fastening of outdoor installation cubicles.  Reconstruction of bioshield, lighting, earthing ring on 330 kV SWYD. Installation of relay protection and control panels - 17 pcs. Installation of cable trays and cabling and wiring products (51,759 km). Execution of commissioning works. 330 kV SWYD site improvements. Execution of telemechanics in accordance with design documentation. 

As of 21.09.2016, the equipment of 330 kV SWYD had been put into operation in full scope.

 Photo

Reconstruction 750 kV SWYD at 750 kV SS “Vinnitskaya”, bay of 750 kV OHL “Zapadnoukrainskaya”, including replacement of voltage transformers, line traps

 

 

Construction works,

electrical installation works

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”.
Scope of Work: The set of construction, installation, and installation-setup works at 750 kV SS “Vinnitskaya” on reconstruction of 750 kV SWYD “Vinnitskaya”, bay of 750 kV OHL “Zapadnoukrainskaya”, including replacement of voltage transformers and line traps.
Date of the Contract signing: 29.03.2016.
Commencement of works:  June 13, 2016
 Completion of works: July 30, 2016          
   The set of construction, installation and installation-setup works, including supply of equipment for the facility, includes the following reconstruction:
The existing equipment of 750 kV SWYD was dismantled and the following equipment was installed:
-Voltage transformer TEIMF 765 type -3 phases;
-Line trap LPT 1/2000/40 type - 4 pcs.
-External installation cubicle for voltage transformer terminals -1 pc.
-750 kV voltage transformer West. Ukr. secondary circuits cubicle - 1 pc.
Installation of foundations (3 pcs.) and metal posts (3 pcs.) for 750 kV voltage transformer. Installation of cabling and wiring products. Earthing of the installed equipment. Execution of commissioning works. 

As of 30.07.2016, the equipment of 750 kV SWYD had been put into operation in full scope.  

 Photo

750 kV SS “Vinnitskaya". Reconstruction of 750 kV SWYD at 750 kV SS “Vinnitskaya”, shunting reactor’s bay ShR-750 “Zapadnoukrainskaya"

 

 

Construction works,

electrical installation works

Employer: SE “NPC “Ukrenergo”, separated division “South - Western power grid”.
Scope of Work: The set of construction, installation and installation-setup works at 750 kV SS “Vinnitskaya” on replacement of 2 phases of 750 kV shunting reactors and 3 phases of 750 kV surge arrestors in 750 kV reactor bay “Zapadnoukrainskaya”.
Date of the Contract signing: 17.03.2016. 
Commencement of works: April 13, 2016
 Completion of works: June 26, 2016          
   The set of construction, installation and installation-setup works, including supply of equipment for the facility, includes the following reconstruction:
The existing equipment of 750 kV SWYD was dismantled and the following equipment was installed:
-Shunting reactor ROM-110000/750 type - 2 pcs.;
-Surge arrestors 3EP3 612-5PK54-2NE1 type - 3 phases.
-35 kV post insulators of the fourth beam of shunting reactors - 2 pcs.
Dismantling and installation of existent oil-drip pots - 2 pcs. Installation of foundations (2 pcs.) and metal posts (2 pcs.) for 35 kV post insulators. Extension of one fire protection subwall between phases “B” and “C” of the reactors. Installation of cabling and wiring products. Installation of cubicle for power supply of welding equipment YaK-4 type (1 pc.) and YRP-100 type (1 pc.). Earthing of the installed equipment. Execution of commissioning works.  

As of 26.06.2016, the equipment of 750 kV SWYD had been put into operation in full scope.     

 Photo

Modification of design and estimate documentation, engineering drawings and accomplishment of construction works under the project “Reconstruction of 110 kV SWYD on 330/110/10 kV SS «Novokievskaya»

 

 

Construction works,

electrical installation works

 

Employer: SE “NPC “Ukrenergo”, Separate business unit “Central electric energy system”

Scope of Work: Set of works on modification of detail design under the project “Reconstruction of 110 kV SWYD on 330/110/10 kV SS «Novokievskaya», including supply of the equipment, execution of construction, electrical installation and commissioning works.   
                        
Date of the Contract signing: November 27, 2015.

             The complex of construction, installation and commissioning work, including supply of equipment, was performed at SS Novokievskaya in a period from April to July 2017. These works include reconstruction of the following:

-    Replacement of 110 kV circuit breakers in existing bays No 1 (Tarasovka-1), No 3 (AT-2), No 6 (AT-1) and No 7 (Dneprovskaya) with SF6 ones;
-    Installation of 110 kV equipment in new bays No 1b (Chabanyi-1) and No 24 (AT-3);
-    Installation of two bus bar and two line gantries;
-    Arrangement of one new lightning rod on SK-26 pole and reconstruction of one existing lightning rod;
-    Reconstruction of 110 kV SWYD grounding and external lighting;
-    Installation of cable trays, cabling and wiring products.
-    Installation of two relay protection and automation panels in the existing premises of substation control building
-    Completion of works on arrangement of interior and exterior finishing of the extension to substation control building;
-    Arrangement of heating and fire alarm systems of the extension to substation control building;
-    Arrangement of telemechanics and metering systems.
-    Replacement of control panel in main control room
-    110 kV SWYD existent fencing reconstruction
-    110 kV SWYD territory improvement

High-voltage equipment of 110 kV SWYD and relay protection and automation microprocessor-based devices were supplied as of 29.12.2015

Heat energy meters (investment program 2016)

Construction works

- there were performed design works for 60 pcs. of heat energy meters; 
- there were installed 55 pcs. of heat energy meters.

Reconstruction of 110 kV combined OHL-CL SS “Oktyabrskaya” - PU31 - SS “Mototsikletnaya” No 1, 2”. Stage 2 (2016)

Construction works,

electrical installation works

There was performed set of works on replacement of 110 kV oil filled cables with XLPE cable with total length of 15 620 LM.

Development of design estimate documentation

“Lavina” shopping and entertainment mall, located at 6, Berkovetskaya street in Kyiv city.  External power supply

Design works

Employer - “Megaline Global Ukraine” LLC.
Design stage - Basic design, Detail design documentation.
Brief description of ongoing design works - construction of a new 110/10/10 kV substation “Berkovetskaya”, laying of two 110 kV cable lines by means of branch line from the overhead lines “Severnaya- Irpen No3”, “Severnaya - Belichi”, laying of 10 kV cable lines for power supply of built-in 10 kV transformer substations of the “Lavina” shopping and entertainment mall, laying of fiber-optic communication line from SS “Belichi” to SS "Berkovetskaya". 
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer, engineering solution of PJSC “Kyivenergo” was obtained, a comprehensive state examination was passed and positive evaluation report was received. The facility is put into operation.

Reconstruction of heating main No. 1 “Otradnyiy” district boiler house on the section from TK 138a to the fixed support between ТК 140 and ТК 141 at 27, V. Getmana street in Kyiv city

Design works

Employer - PJSC "Kyivenergo."
Design stage - Detail design.
Brief description of ongoing design works - reconstruction of existing heating network, including replacement of pipelines with a diameter of 500 mm with new ones, with a diameter of 600 mm, with a total length of 330 m.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer, engineering solution from PJSC “Kyivenergo” was obtained.

Field supervision of the construction of facility “750 kV overhead transmission lines for delivery of power from Rovenskaya and Khmelnitskaya NPPs: 750 kV OHL Rovenskaya NPP - Kievskaya with an extension 750 kV SS “Kievskaya”and 750 kV OHL approach lines

Design works

Employer - SE “NPC “Ukrenergo”.
Brief description of ongoing construction and installation works, that are the subject of field supervision - extension of 750 kV SWYD for connection of two 750 kV OHL from Rovenskaya and Khmelnitskaya NPPs, including installation of three circuit breakers, installation of two groups of 750 kV shunting reactors on OHL from Rovenskaya and Khmelnitskaya NPPs with capacity of 3x110 MVAr, installation of two 750 kV circuit breakers for two groups of 750 kV shunting reactors. It is foreseen construction of the following facilities: 750 kV relay house RH No1, oil facilities operator’s room, auxiliary facilities (repair and maintenance personnel building, SF6 equipment repairing building), two groups of 750 kV shunting reactors automatic fire extinguishing valves chamber, building protection class is IV.
Stage of works execution - the facility is put into operation, field supervision performed in full scope.

Field supervision of the construction of facility “Fiber-optical communication line along the 330 kV OHL routes Rovenskaya NPP - Grabov - Rovno - Khmelnitskaya NPP”

Design works

Employer - SE “NPC “Ukrenergo”.
Brief description of ongoing construction and installation works, that are the subject of field supervision - replacement of the existing steel groundwire on 330 kV overhead lines with special groundwire with built-in optical fibers. The total length of FOCL is 176,916 km. Also installation of station communication equipment at Rovenskaya NPP, Khmelnitskaya NPP, 330 kV SS “Grabov”, 330 kV SS “Rovno” is ongoing.
Stage of works execution - construction and installation works are ongoing.


Field supervision of the construction of facility “Reconstruction of 110 kV combined OHL-CL SS “Oktyabrskaya” - PU31 - SS “Mototsikletnaya” No 1, 2”

Design works

Employer - PJSC "Kyivenergo."
Brief description of ongoing construction and installation works, that are the subject of field supervision - reconstruction of two existing 110 kV combined OHL-CL from 330 kV SS “Oktyabrskaya” to 110 kV SS “Mototsiklektnaya” including replacement of OHL section of 330 kV SS “Oktyabrskaya”-PU-31 and oil filled cable from PU-31 to SS “Mototsiklektnaya” with 110 kV XLPE cables. The total length of each new 110 kV cable line is 3,8 km.
Stage of works execution - the facility is put into operation, field supervision performed in full scope.

Construction of social and trade center at 36, Moscowskiy av. in Obolonskiy district of Kyiv city. Power electrical equipment and electric lighting

Design works

Employer - “Extreme Ltd” LLC.
Design stage - Basic design, Detail design documentation.
Brief description of ongoing design works - development of design documentation for indoor power electrical equipment and electric lighting of shopping center with total area of 192 628,00 m2, total load is 16 160,00 kW. The following works are being performed as a part of project - construction of two built-in 10 kV distribution units with transformer substations (4 dry transformers each of them) and three built-in 10/0,4 kV transformer substations with 4 dry transformers each of them. The total number of 10/0,4 kV transformers - 20 pcs. with a capacity of 1600 kVA each of them. Installation of indoor 0,4 kV power distribution networks and lighting network.
Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Development of detail design for installation of heat metering devices on inputs of residential houses

Design works

Employer - PJSC "Kyivenergo."
Design stage - Detail design.
Brief description of ongoing design works - installation of heat energy meters for heating system of residential buildings in Kyiv city, 62 heat energy meters totally.
Stage of design work execution - design documentation was developed in full scope, agreed and delivered to the Employer.

Construction of a biofuel thermal power plant with a capacity of 7.5 MW, located at: Karpilovskiy Village Council, Kozeletskiy district, Chernigov region

Design works

Employer - “Desna TPP” LLC.
Design stage - Feasibility study, Basic design.
Brief description of ongoing design works - integrated development of design documentation for thermal power plant with a capacity of 7,5 MW.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A state examination was passed and positive evaluation report was obtained.

Construction of a biofuel thermal power plant with a capacity of 7500 kW, located at: Semenovskiy City Council (beyond Semenovka city line), Semenovskiy district, Chernigov region

Design works

Employer - “Semenovskaya TPP” LLC.
Design stage - Feasibility study, Basic design.
Brief description of ongoing design works - integrated development of design documentation for thermal power plant with a capacity of 7500 kW.
Stage of design work execution - feasibility study developed in full scope and delivered to Employer. State examination of sanitary and epidemiological welfare of the public, ecology and operational safety was passed and positive evaluation report was obtained. Design documentation of Basic design stage was developed in full scope and delivered to the Employer, a state examination is ongoing.

 

330 kV SS “Vinnitskaya". Reconstruction of 330 kV SWYD with full replacement of the equipment and introduction of progressive technological solutions (adjustment)

Design works

Employer - SE “NPC “Ukrenergo”.
Design stage - Detail design.
Brief description of ongoing design works - Reconstruction of 330 kV SWYD at 330 kV SS “Vinnitskaya”, including replacement of: 330 kV circuit breakers and current transformers in bays ”3V”, “4V”, “5V”, “6V” with SF6 ones; “1SSh-330 kV”, “2SSh-330 kV”, 330 kV OHL “Vinnitskaya 750”, 330 kV OHL “”Lad. TPP”, 330 kV OHL “Bar” voltage transformers with SF6 ones; 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750”, 330 kV OHL “Lad. TPP” coupling capacitors; bus-bar supports; 330 kV OHL “Bar”, 330 kV OHL “Vinnitskaya 750” line traps; 330 kV surge arrestors “AT-2”; 330 kV disconnector’s driving motors; installation of two sets of 330 kV VT’s “1SSh-330 kV” and “2SSh-330 kV” single pole disconnectors; 330 kV SWYD bioshield; 330 kV SWYD lighting; 330 kV SWYD earthing ring.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received.

Reconstruction of 110 kV SWYD at substation 330/110/10 kV “Novokievskaya” (adjustment)

Design works

Employer - SE “NPC “Ukrenergo”.
Design stage - Basic design and Detailed design documentation.
Brief description of ongoing design works - construction of seven new 110 kV bays; reconstruction of existent 110 kV SWYD, including replacement of: 110 kV circuit breakers, 110 kV current transformers, 110 kV voltage transformers, sectioning of 110 kV busbar systems and separation of 110 kV transfer busbars; construction of extension to substation control building, installation of new lightning rods. Allotment of two construction startup complexes.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received.

330 kV SS “Khmelnitskaya". Reconstruction of 110 kV SWYD, including complete replacement of the equipment and introduction of progressive technological solutions (construction completion)

Design works

Employer - SE “NPC “Ukrenergo”.
Design stage - Detail design documentation.
Brief description of ongoing design works - replacement of existent 110 kV current transformers in scope of eight three-phase sets with new ones, remounting of existent 110 kV current transformers in scope of three three-phase sets on new supporting structures, replacement of bus arrangement on sections 110 kV current transformer - 110 kV circuit breaker - 110 kV disconnector in eleven bays.
Stage of design work execution - design documentation was developed in full scope and delivered to the Employer. Field supervision of the facility construction is ongoing.

330 kV SS “Shepetovka". Reconstruction of 35 kV SWYD (adjustment)

Design works

Employer - SE “NPC “Ukrenergo”.
Design stage - Detail design.
Brief description of ongoing design works - reconstruction of 35 kV SWYD, including complete replacement of the 35 kV equipment: 35 kV circuit breakers - 8 pcs., 35 kV disconnectors - 16 pcs., 35 kV surge arresters - 12 pcs., 35 kV current transformers - 24 pcs., 35 kV voltage transformers - 12 pcs.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received. Field supervision of the facility construction is ongoing.

Adjustment of project design “750 kV overhead transmission lines for delivery of power from Rovenskaya and Khmelnitskaya NPPs: 750 kV OHL Rovenskaya NPP - Kievskaya with an extension 750 kV SS “Kievskaya” and 750 kV OHL approach lines

Design works

Employer - SE “NPC “Ukrenergo”.
Design stage - Basic design.
Brief description of ongoing design works - adjustment of the project design, including brining of design solutions into compliance with valid norms and revaluation of construction budget considering material resources and equipment price escalation for all startup complexes.
- the first startup complex: residential building in Makarov town settlement; 
- the second startup complex: repair and operational station in Sarny city;
- the third startup complex: repair and operational station in Korosten city;
- the fourth startup complex: repair and operational station in Novograd-Volyinskiy city;
- the fifth startup complex: Fiber-optical communication line along the 330 kV OHL routes Rovenskaya NPP - Grabov - Rovno - Khmelnitskaya NPP;
- the sixth startup complex: diversion of 750 kV OHL Khmelnitskaya NPP - Chernobyilskaya to 750 kV SS “Kievskaya";
- the seventh startup complex: line operating radio communications for 750 kV OHL maintenance;
- the eighth startup complex: 750 kV OHL Rovenskaya NPP - 750 kV SS “Kievskaya”;
- the ninth startup complex: expansion of 750 kV SS “Kievskaya”.
Stage of design work execution - the design documentation was developed in full scope and delivered to the Employer. A comprehensive state examination was passed and positive evaluation report was received.

Construction of hydro power plant “HPP Khani 7” on the Khanistskali river, municipality of Baghdati, Imereti region, western Georgia

Design works

Employer - Ministry of energy of Georgia.
Design stage - Feasibility study.
Brief description of ongoing design works - integrated development of design documentation for diversion hydro power plant with a capacity of 12,6 MW.
Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Reconstruction of buildings and facilities complex, including completion and expansion for allocation of sales outlets there at the address: 23 Moskovskiy av., Kyiv city. External power supply (stage 2)

Design works

Employer - “Construction company “MPK” LLC.
Design stage - Detail design.
Brief description of ongoing design works - external power supply of shopping and entertainment mall with a total load of 3200 kW. The following works are being performed under the project - installation of two additional 10 kV bays in distribution unit No 514; laying of two 10 kV cable lines from distribution unit No 514 to new 10/0.4 kV TS; construction of cable-pipe sewer for laying of 0.4 kV cables from new 10/0.4 kV TS to the shopping and entertainment mall; laying of 0.4 kV cable line; development of 0.4 kV internal power supply grids of the facility.
Stage of design work execution - development of design documentation is ongoing.

Reconstruction of 330 kV SWYD at CHPP-6 of Separate Business Unit “Kyiv CHPP”, including installation of AT-3 with a capacity of 200 MVA

Design works

Employer - PJSC "Kyivenergo."
Design stage - Basic design, Detail design documentation.
Brief description of ongoing design works - reconstruction of 330 kV SWYD, including construction of 330 kV GIS with nine 330 kV circuit breakers; installation of new 330 kV autotransformer with a capacity of 200 MVA; shifting of existent 330 kV autotransformers; reconnection of all 330 kV feeders to newly-built 330 kV GIS; reconstruction of all engineering networks at transformer yard of CHPP-6.
Stage of design work execution - development of design documentation is ongoing.

Reconstruction of switchyard (transformer group) and G-1 generator of power-generating unit No1 of Kyiv CHPP-5

Design works

Employer - PJSC "Kyivenergo."
Design stage - Detail design documentation.
Brief description of ongoing design works - laying of 110 kV cable line from 110 kV SWYD to power transformers of power-generating unit No1, replacement of T-21 auxiliary power transformer with a voltage of 10/6/6 kV and capacity of 40 MVA, replacement of 6 kV current leads from T-21 to 6 kV switchgear and control gear, replacement of 10 kV generator current lead from power transformers of power-generating unit No1 to generator’s circuit breaker.
Stage of design work execution - development of design documentation is ongoing.

Zaporozhskaya NPP. Additional cable routes between 750 kV SWYD, group of auxiliary buildings and central control room. Construction and cable structures

Design works

Employer - State Enterprise “National Nuclear Energy Generating Company “Energoatom”, Separated subdivision Zaporozhskaya NPP.
Design stage - development of structural engineering drawings.
Brief description of ongoing design works - execution of building part of cable tray systems and cable-support structures for additional cable route between 750 kV SWYD and central control room due to connection to 750 kV SWYD of a new 750 kV OHL to 750 kV SS “Kakhovskaya”.
Stage of design work execution - development of design documentation is ongoing.

Dnestr photo 2015

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07301
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.