·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 19, 2018
·
20.07.2018 Information on the total number of shares and voting shares of PJSC "CBC-Dnepr" as of Jule 18, 2018
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
·
18.06.2018 For the attention of shareholders PJSC "SVS-Dnipro"
  Last news

·
22.07.2013 What does company need to be successful, authoritative and to gain social acceptance?
·
01.10.2010 Laying of high-voltage CL in Ukraine - the experience of "SVS-DNIPRO" company. Elektropanorama # 9, 2010.
·
16.06.2010 Vladimir Vypyraylo: motto of "SVS-DNIPRO" – always be on step ahead of!

Name
E-mail

GISMETEO: Погода по г.Киев
Finalized projects · 2017 projects
2017 projects
Name of project/Type of works Specification

Reconstruction of buildings and facilities complex, including completion and expansion for allocation of sales outlets there at the address: 23 Moskovskiy av., Kyiv city

 

 

Construction works,

electrical installation works

 

 

General Contractor — BK MPK LLC.

Scope of Work: Set of construction, electrical installation and commissioning works

 for the second stage of the facility’s external power supply: “Reconstruction of buildings and facilities complex, including completion and expansion for allocation of sales outlets there at the address: 23 Moskovskiy av., Kyiv city”

Date of the Contract signing: 01.09.2016

Commencement of works: 01.10.2016

Works completion: 30.10.2017

The set of completed construction, electrical installation and commissioning works for the second stage of the facility’s external power supply is the following:

  • laying of 5 900 meters of cable for two 10 kV cable lines from distribution center 514 to a new 10/0,4 kV TS;
  • installation of two additional 10 kV bays in distribution center 514;
  • construction of cable duct for 0,4 kV cable line;
  • arrangement of cable runways made from steelworks for 0,4 kV cable line;
  • laying of 13 600 meters of 0,4 kV cables from new 10/0,4 kV TS to the shopping mall;
  • switching of existing loads to 10/0,4 kV built-in transformer substation;
  • execution of commissioning works in distribution center 514;
  • performance of works on the territory landscaping restoration.

Reconstruction of electrical part of equipment of power unit No3 of Kaniv HPP branch of Ukrhidroenerho PJSC

Construction works,

electrical installation works

 

Kyiv energy construction company LLC for the period from 2016 to 2017 performed the following complex of works on reconstruction of electrical part of equipment of power unit No3 of Kaniv HPP branch of Ukrhidroenerho PJSC:

  • Reconstruction of 110 kV equipment, namely:

- replacement of 110 kV voltage transformer,

- replacement of 110 kV current transformer,

- replacement of 110 kV disconnector,

- replacement of 110 kV ground terminal.

  • Replacement of existing generator busduct with isolated phase one with RIP-insulation in nylon protective enclosure manufactured in Switzerland.
  • Installation 6,3kV equipment: generator circuit breakers, current transformers, voltage transformers, disconnectors.
  • Installation of 6,3kV switchgear and control gear.
  • Installation of excitation system.
  • Replacement of auxiliaries AC and DC power cubicles.
  • Replacement of 6,3 kV current-limiting reactor.
  • Electrical installation work on arrangement of technical water supply, drainage and dehydrating systems.
  • Arrangement of 110 kV and 6,3kV disconnectors’ electromagnetic interlocking.
  • Installation of disturbance recorder devices and cabinets.
  • Installation and automation of power unit No3 ventilation system.
  • Reconstruction of integrated cable system.

Works were organized and performed with proper quality control, in accordance with approved work schedule. After integrated test, all installed equipment operates reliably with observance of design parameters. Works were performed on a high professional level with observance of requirements of regulatory, design and process documentation, as well as in conformity with safety rules and fire precautions.

The facility was successfully put into operation.

 Photo

 

 

Development of design estimate documentation

Field supervision of the construction of facility Fiber-optical communication line along the 330 kV OHL route Rovenskaya NPP - Grabov - Rovno - Khmelnitskaya NPP

Design works

Employer - Ukrenergo NPC SE.

Brief description of ongoing construction and installation works, that are the subject of field supervision - replacement of the existing steel groundwire on 330 kV overhead lines with special groundwire with built-in optical fibers.  The total length of FOCL is 176,916 km.  Also installation of station communication equipment at Rovenskaya NPP, Khmelnitskaya NPP, 330 kV SS Grabov, 330 kV SS Rovno is ongoing.

Stage of works execution - construction and installation works are ongoing.

Construction of a biofuel thermal power plant with a capacity of 7500 kW, located at: Semenovskiy City Council (beyond Semenovka city line), Semenovskiy district, Chernigov region

Design works

Employer - Semenovskaya TPP LLC.

Design stage - Feasibility study, Basic design.

Brief description of ongoing design works - integrated development of design documentation for thermal power plant with a capacity of 7500 kW.

Stage of design work execution - feasibility study developed in full scope and delivered to Employer. State examination of sanitary and epidemiological welfare of the public, ecology and operational safety was passed and positive evaluation report was obtained. Design documentation of Basic design stage was developed in full scope and delivered to the Employer, a comprehensive expert examination was passed and positive evaluation report was obtained.

Reconstruction of buildings and facilities complex, including completion and expansion for allocation of sales outlets there at the address: 23 Moskovskiy av., Kyiv city.  External power supply (stage 2)

Design works

Employer - Construction company MPK LLC.

Design stage - Detail design.

Brief description of ongoing design works - external power supply of shopping and entertainment mall with a total load of 3200 kW.  The following works are being performed under the project - installation of two additional 10 kV bays in distribution unit No 514; laying of two 10 kV cable lines from distribution unit No 514 to new 10/0.4 kV TS; construction of cable duct for laying of 0.4 kV cables from new 10/0.4 kV TS to the shopping and entertainment mall; laying of 0.4 kV cable line; development of 0.4 kV internal power supply grids of the facility.

Stage of design work execution - design documentation was developed in full scope and delivered to the Employer. Technical solution of Kyivenergo PJSC was received.

Reconstruction of 330 kV SWYD at CHPP-6 of Kyiv CHPPs Separate Business Unit, including installation of AT-3 with a capacity of 200 MVA

Design works

Employer - Kyivenergo PJSC.

Design stage - Basic design, Detail design documentation.

Brief description of ongoing design works - reconstruction of 330 kV SWYD, including construction of 330 kV GIS with nine 330 kV circuit breakers; installation of new 330 kV autotransformer with a capacity of 200 MVA; shifting of existent 330 kV autotransformers; reconnection of all 330 kV feeders to newly-built 330 kV GIS; reconstruction of all engineering networks at transformer yard of CHPP-6.

Stage of design work execution - basic design documentation was developed in full scope and delivered to the Employer. A comprehensive state expert examination is ongoing.

Reconstruction of switchyard (transformer group) and G-1 generator of power-generating unit No1 of Kyiv CHPP-5

Design works

Employer - Kyivenergo PJSC.

Design stage - Detail design documentation.

Brief description of ongoing design works - laying of 110 kV cable line from 110 kV SWYD to power transformers of power-generating unit No1, replacement of T-21 auxiliary power transformer with a voltage of 10/6/6 kV and capacity of 40 MVA, replacement of 6 kV busduct from T-21 to 6 kV switchgear and control gear, replacement of 10 kV generator’s busduct from power transformers of power-generating unit No1 to generator’s circuit breaker.

Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Zaporozhskaya NPP. Additional cable routes between 750 kV SWYD, group of auxiliary buildings and central control room.  Construction and cable structures

Design works

Employer - National Nuclear Energy Generating Company Energoatom State Enterprise, Separated subdivision Zaporozhskaya NPP.

Design stage - development of structural engineering drawings.

Brief description of ongoing design works - execution of building part of cable tray systems and cable-support structures for additional cable route between 750 kV SWYD and central control room due to connection to 750 kV SWYD of a new 750 kV OHL to 750 kV SS Kakhovskaya.

Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

Field supervision of the construction of facility 330 kV SS Khmelnitskaya. Reconstruction of 110 kV SWYD, including complete replacement of the equipment and introduction of progressive technological solutions (construction completion)

Design works

Employer - Ukrenergo NPC SE.

Brief description of ongoing construction and installation works, that are the subject of field supervision - replacement of existent 110 kV current transformers in scope of eight three-phase sets with new ones, remounting of existent 110 kV current transformers in scope of three three-phase sets on new supporting structures, replacement of bus arrangement on sections 110 kV current transformer - 110 kV circuit breaker - 110 kV disconnector in eleven bays.

Stage of works execution - the facility was put into operation, field supervision performed in full scope.

Field supervision of the construction of facility 330 kV SS Shepetovka. Reconstruction of 35 kV SWYD (adjustment)

Design works

Employer - Ukrenergo NPC SE.

Brief description of ongoing construction and installation works, that are the subject of field supervision - reconstruction of 35 kV SWYD, including complete replacement of the 35 kV equipment: 35 kV circuit breakers - 8 pcs., 35 kV disconnectors - 16 pcs., 35 kV surge arresters - 12 pcs., 35 kV current transformers - 24 pcs., 35 kV voltage transformers - 12 pcs.

Stage of works execution - the facility was put into operation, field supervision performed in full scope.

Reconstruction of 7 bays of the first and second sections of bus bar of 110 kV SWYD at CHPP-6

Design works

Employer - Kyivenergo PJSC.

Design stage - Detail design.

Brief description of ongoing design works - reconstruction of the seven existing bays on 110 kV SWYD, including replacement of: 110 kV circuit breakers, 110 kV current transformers, 110 kV voltage transformers, 110 kV disconnectors; installation of new relay protection, automation and metering cubicles; introduction of substation automated control system; installation of new lightning rods and reconstruction of substation outdoor lighting system.

Stage of design works execution - design documentation was developed in full scope and delivered to the Employer, a comprehensive expert examination was passed and positive evaluation report was obtained.

Reconstruction of auxiliaries scheme of CHPP-5 of Kyiv CHPPs Separate Business Unit of Kyivenergo PJSC, including replacement of T-20 transformer

Design works

Employer - Kyivenergo PJSC.

Design stage - Detail design.

Brief description of ongoing design works - replacement of the existing T-20 110/6/6 kV auxiliaries power transformer with a capacity of 32 MVA with a new one, having capacity of 40 MVA; replacement of ground terminal in T-20 neutral; replacement of existing arrestors on 110 kV and 6,3 kV sides and neutral with surge arrestors; replacement of 6 kV busduct from T-20 to the main building; replacement of 6 kV main switches of RShA and RShB sections with vacuum ones; replacement of 6 kV VT of RShA and RShB sections; reconstruction of T-20 transformer’s earthing loop; reconstruction of illumination and lightning protection of T-20 bay; restoration (repair) of T-20 transformer’s railway tracks from the bay to CHPP-5 transformers yard railway tracks; reconstruction of the existing T-20 oil receiver; reconstruction of T-20 equipment fence; installation of new relay protection, automation and metering cubicles, laying of 110 kV cable line from 110 kV SWYD to the new T-20 transformer.

Stage of design works execution - design documentation was developed in full scope and delivered to the Employer, a comprehensive expert examination was passed and positive evaluation report was obtained.

Construction of the passenger terminal and service facilities of Zaporozhe International airport. External power supply

Design works

Employer - Univenterm LLC.

Design stage - Basic design and Detail design documentation.

Brief description of ongoing design works - for facility’s power supply design provides installation of 6/0,4 kV package two transformers substation with two transformers with a capacity of 1000 kVA each of them; for power supply of the first category electrical consumers, it is provided installation of diesel generator with a capacity of 400 kVA (320 kW) 380/220 V, 50 Hz (with electronically controlled start up); laying of 0,4 kV cables in cable duct, including arrangement of wells for terminal loads power supply; also it is foreseen cable duct from back supply generator to 0,4 kV SWYD of the terminal.

Stage of design works execution - Basic design documentation was developed in full scope and delivered to the Employer, a comprehensive expert examination was passed and positive evaluation report was obtained. Detail design documentation was developed in full scope and delivered to the Employer.

Reconstruction of the electrical part of ST-1

Design works

Employer - Kyivenergo PJSC.

Design stage - Detail design.

Brief description of ongoing design works - installation of new 6 kV switchgear (SG) for the heating plant auxiliaries; laying of two 6 kV cable lines for delivery of power supply to 6 kV SG from 110/6 kV substation ST-1; installation of two auxiliaries 6/0,4 kV packaged transformer substations (PTS); construction of 6 kV cable lines from 6 kV SG to 6/0,4 kV PTS; installation of new 0,4 kV switchgear (SG) for the heating plant auxiliaries; construction of 0,4 kV cable links from 0,4 kV SG to consumers of the heating plant auxiliaries.

Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

330/220/110 kV SS Lvov-Yuzhnaya Reconstruction (Replacement of 1250 MVA AT-5). Adjustment

Design works

Employer - Ukrenergo NPC SE.

Design stage - Detail design documentation.

Brief description of ongoing design works - construction of new 110 kV bay for connection of 330/110 kV autotransformer with installation of 110 kV circuit breaker, 110 kV current transformers, 110 kV voltage transformers, 110 kV disconnectors, installation of new relay protection, automation and metering cubicles.

Stage of design work execution - design documentation was developed in full scope and delivered to the Employer.

New build of 500 kV SS Kreminska with diversions of OTL 500 kV Donbasska - Donska and OTL 220 kV Kreminska - Yuvileina, Lugansk region

Design works

Employer - Ukrenergo NPC SE.

Design stage - Basic design and Detailed design documentation.

Brief description of ongoing design works - construction of new 500 kV substation Kreminska in the following scope: installation of 500 kV gas-insulated switchgear (GIS) according to “quadrangle” scheme; installation of 4 autotransformers AODTsTN-167000/500/220/35 type (3 operating phases and 1 backup one); installation of 220 kV GIS according to "two operating busbars” scheme; installation of 35/0,4 kV auxiliary transformer, which connects via switching devices on the high voltage side directly to the 35 kV bushings of autotransformer’s phases; connection of two of 500 kV lines in 500 kV GIS and two 220 kV lines in 220 kV GIS; installation of three phases of 220 kV voltage transformer in 220 kV line in order to provide the second source of substation’s auxiliaries power supply; installation of diesel power station as backup power supply; construction of substation control room, combined with 500 kV GIS building; construction of relay house, combined with 220 kV GIS; installation of auxiliaries board; installation of two DC boards and two accumulator batteries; arrangement of earthing on substation; arrangement of lighting protection on substation; arrangement of external task lighting and perimetral security lighting systems; construction of gatehouse, combined with radiation proof shelter; construction of fire pumping station building and fire reserve water storage tank; construction of valves switching chamber building; arrangement of two water-supply wells. Construction of diversions of OTL 500 kV Donbasska - Donska at SS Kreminska. The length of each diversion is 0,58 km. Construction of 220 kV Kreminska - Yuvileina double circuit power transmission line, which consists of overhead section with the length of 24,9 km and cable section on approach to substation Yuvileina with the length of 1,5 km. Reconstruction, including expansion of 220 kV SWYD on substation Yuvileina. Construction of access road to substation Kreminska with the length of 8,7 km.

Stage of design works execution - Basic design documentation was developed in full scope and delivered to the Employer, a comprehensive expert examination was passed and positive evaluation report was obtained. Working documentation is under development.

2016 SS330(110)

Headquarters:
4a, Promyslova St., Kiev, 01013
Phone: +38 (044) 545-71-24, 25
Production facilities:
4, Shkilna St., Vyshgorod, 07300
Phone: +38 (044) 430-36-17, 451-67-21,
+38 (04496) 54-9-23
 
© 1993 - 2018 SVS-Dnepr PrJSC . All rights reserved.